Loading...
HomeMy WebLinkAbout0118810 P e OSHKOSH ON THE WATER Job Address 532 W 14TH AVE CITY OF OSHKOSH No 118810 PLUMBING PERMIT - APPLICATION AND RECORD Contractor SAMMONS PLUMBING 0 0 0 0 0 0 1 0 0 0 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner MICHAEL J GRIESBACH SR Plan Create Date 04/06/2006 Category 411 - Residential-Water Heaters Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures UselNature ofWork Valuation Issued By 0 0 0 0 0 0 0 0 0 Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Sanitary Sewer Size Storm Sewer Water Service $600.00 Plan Approval 0 0 0 0 0 0 0 0 0 WaitSt Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 Shamp Sink ~ 0 FlrlWst Sink 0 0 Catch Basin 0 0 Wash Ftn 0 0 Urinal 0 0 Standp Rec 0 0 Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker ~ Int Grease Trap ~ Ext Grease Trap ~ RPZ Valve 0 Eye Wash Statn 0 WtrSewerMtrs 0 Deduct Meters 0 Wtr Usage Mtrs $0.00 Material Permit Fees Type # 0 0 0 0 0 Conn. Type 0 0 0 0 0 Parcel Id # 1300800000 $20.00 0 Permit Voided I Date 04/06/2006 WI 54901 - 2298 Address 522W.MURDOCKAVE Agent/Owner OSHKOSH In the performance of this work, I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.