Loading...
HomeMy WebLinkAbout2006-Building e OSHKOSH ON THE WATER Job Address 421 N MAIN ST CITY OF OSHKOSH No 118789 BUILDING PERMIT - APPLICATION AND RECORD Owner 421 NORTH MAIN STREET LLC Create Date 04/05/2006 Designer Contractor OWNER Category 231 - Addition Stores & Customer Service Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----2 Sq. Ft. Rooms 0 Height Finished/Living ----2 Sq. Ft. Bedrooms 0 Stories Garage ----2 Sq. Ft. Baths 0 Ft. D Projection I Canopies 0 ------- Signs ----2 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit # Dwelling Units -------------2 # Structures 0 Park Dedication Use/Nature of Work OMM/ Demo the the 1st floor unit. Future alterations to finish the unit will require additional permits and a plan approval. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2.000.00 Issued By: ~ -- Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Date 04/05/2006 Final/O.P. 00/00/0000 D Permit V~ Parcelld # 0700080000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit appli ( t. n within an easement, the City strongiy urges the permit applicant to contact the easement holder(s) and to secure a saryap als before starting such actvity. ,,/ Signature .~ Date 1< jf- S" -- 06 Address 51051 AH MAYTAH RD Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number 426-5956 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.