Loading...
HomeMy WebLinkAbout0118793-Plumbing (laterals) ~ OSHKOSH ON THE WATER Job Address 868 DRIFTWOOD LN CITY OF OSHKOSH No 118793 PLUMBING PERMIT - APPLICATION AND RECORD Owner TOD NOFFKE Create Date 04/05/2006 Contractor BOWERS, ROGER EXCAVATING Category 401 - Residential-Exterior (laterals) Plan Bathtub 0 Shower 0 Water Softner 0 Wait.St. 0 Shamp Sink 0 Coffee Maker 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap -----2 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 Res. Sink 0 Dishwasher 0 Beer Tap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0 Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature r'ffi ~'" AA"" W,~, ~ ~~ of Work Size Material Type # Conn. Type Sanitary Sewer 4" Plastic Lateral 1 New 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 1-1/4" Plastic Lateral New Parcelld # 15-5027 Valuation 1,000.00 Plan Approval $0.00 Permit Fees $100.00 0 Permit Voided I Issued By Date 04/05/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holde and to secure any ne sary approvals before starting such activity. Date t./-õ-o6 KAUKAUNA Wi 54130 - 0000 Telephone Number 414-766-3210 Signature To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.