Loading...
HomeMy WebLinkAbout0118782-Building (roof) e OSHKOSH ON THE WATER Job Address 1103EVANSST CITY OF OSHKOSH No 118782 BUILDING PERMIT - APPLICATION AND RECORD Owner J THOMAS MCDERMOTT Create Date 04/04/2006 Designer Contractor WERNER HOME IMPROVEMENTS LLC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~ Sq. Ft. ~Sq.Ft. Rooms 0 Height Oft. 0 Projection I Finished/Living Bedrooms 0 Stories Canopies Garage ~Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Requi~ Park Dedication Flood Plain Height Permit # Dwelling Units 0 # Structures 0 Use/Nature ofWork FRI Re-roofing the house, complete tear off. No structural work. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~ $4,125.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Date 04/04/2006 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 11 09670000 in the performance of this work I agree to perform ail work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to r an necessary ap ovals before starting such activity. f /, / Signature Date r 51'- 0(" t AgenUOwner Address 2147 POINT COMFORT RD OSHKOSH WI 54902 - 7513 Telephone Number 236-9109 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do We gain entry), your Name and Phone Number. Unless specified otherwise, We will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.