HomeMy WebLinkAbout0118780-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 101 W 14TH AVE
CITY OF OSHKOSH
No
118780
BUILDING PERMIT - APPLICATION AND RECORD
Owner BRIAN DILORI K SCHMIDT
Create Date
0410412006
Designer
Contractor
NJ SCHMIDT CONSTRUCTION INC
Category
141-ExteriorRemodeling
Plan
Type
. Building
a Sign
a Canopy
a Fence
a Raze
Zoning
Class of Const:
Size
UnfinishedlBasement
~Sq.Ft.
~Sq.Ft.
Rooms
0
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies 0
Garage
~Sq.Ft.
Baths
Signs
0
Foundation
. Poured Concrete a Floating Slab
a Concrete Block a Post
a Pier
a Treated Wood
a Other
Occupancy Permit
Flood Plain
Height Permit
--
# Dwelling Units ~
# Structures
~
Park Dedication
UselNature SFR I TEAR OFF AND REPLACE EXISTING ROOFING ON HOUSE, REPLACE WOOD DECKING, NO STRUCTURAL CHANGES
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
$3,000.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
/J}4{)
Date 0410412006
Final/O.P. 0010010000
0 Permit Voided I
Parœlld # 0304410000
In the perfonmanee of this work I agree to perform all work pursuant to rules governing the described construction.
Whiie the City of Oshkosh has no authority to enforee easement restrictions of which it is not a pany, if you perfonm the work
described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and to secur y n essary ~provals before starting such activity.
Date e¡;/ti/o(;.,
Agent/Owner
Signature /'
Address 1753 TALKEETNA RD
NEENAH
WI 54956 - 9420 Telephone Number
920-279-0829
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready-