Loading...
HomeMy WebLinkAbout0118771-Building (roof) e OSHKOSH ON THE WATER Job Address 617 W IRVING AVE CITY OF OSHKOSH No 118771 BUILDING PERMIT. APPLICATION AND RECORD Owner BERNARD W PITZ Create Date 04/03/2006 Designer Contractor OWNER Category 141 . Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~ Sq. Ft. Rooms Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies ~ Garage ~ Sq. Ft. Baths Signs ~ Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit -- Park Dedication # Dwelling Units ----------.JJ # Structures 0 Use/Nature RES/ Reroof house, add layer of shingles over existing single layer. Reside Garage. Metal siding on rear elevation, vinyl on remainder. ofWork HVAC Contractor Plumbing Contractor Electric Contractor 500.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 04/03/2006 Final/O.P. DO/DO/DODO D Permit Voided I Parcelld # 0702600000 In the performance of this work I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmit application within an easement, the City strongly urges the parmit applicant to contact the easement holder(s) and to secure :~y ;ece}ß5,! approvals before starting such activity. Signature tß tv %-i-f Date tf/J/tP'¿ AgenUOwner Address 617 W IRVING AVE OSHKOSH WI 54901 .4317 Telephone Number 9w '2Jf-:'~'l? t/ To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.