HomeMy WebLinkAbout0118771-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 617 W IRVING AVE
CITY OF OSHKOSH
No
118771
BUILDING PERMIT. APPLICATION AND RECORD
Owner BERNARD W PITZ
Create Date
04/03/2006
Designer
Contractor
OWNER
Category
141 . Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~ Sq. Ft.
Rooms
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies ~
Garage
~ Sq. Ft.
Baths
Signs
~
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit Not Required
Flood Plain
Height Permit
--
Park Dedication
# Dwelling Units ----------.JJ
# Structures
0
Use/Nature RES/ Reroof house, add layer of shingles over existing single layer. Reside Garage. Metal siding on rear elevation, vinyl on remainder.
ofWork
HVAC Contractor
Plumbing Contractor
Electric Contractor
500.00 Plan Approval
$0.00 Permit Fee Paid
$44.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 04/03/2006
Final/O.P. DO/DO/DODO
D Permit Voided I
Parcelld # 0702600000
In the performance of this work I agree to perfonm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this penmit application within an easement, the City strongly urges the parmit applicant to contact the easement
holder(s) and to secure :~y ;ece}ß5,! approvals before starting such activity.
Signature tß tv %-i-f Date tf/J/tP'¿
AgenUOwner
Address 617 W IRVING AVE
OSHKOSH
WI 54901 .4317
Telephone Number 9w '2Jf-:'~'l? t/
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.