Loading...
HomeMy WebLinkAbout0118714-Building (door) 0 OSHKOSH ON THE WATER Job Address 427 MERRITT AVE CITY OF OSHKOSH No 118714 BUILDING PERMIT - APPLICATION AND RECORD Owner MARION BOELTER Create Date 03/30/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ---2 Sq. Ft. ---2 Sq. Ft. Rooms Height OFt. D Projection I Finished/Living Bedrooms 0 Stories Canopies ----.I! Garage ---2 Sq. Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature ofWork FR/ Replacing the rear door off the kitchen with a 6. patio door. A code compliant header will be installed. The patio door will exit onto he existing deck. Installing a smaller window in the existing window space in the kitchen area. The header is existing. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuat~ Issued By: L\ $1.500.00 Plan Approval ~O.OO Permit Fee Paid $26.00 Park Dedication $0.00 Date 03/30/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0400370000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. ~ Signature Da ~- ¿()- ô ¿, Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number Address To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.