HomeMy WebLinkAbout0118714-Building (door)
0
OSHKOSH
ON THE WATER
Job Address 427 MERRITT AVE
CITY OF OSHKOSH
No
118714
BUILDING PERMIT - APPLICATION AND RECORD
Owner MARION BOELTER
Create Date
03/30/2006
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
---2 Sq. Ft.
---2 Sq. Ft.
Rooms
Height
OFt.
D Projection I
Finished/Living
Bedrooms 0
Stories
Canopies ----.I!
Garage
---2 Sq. Ft.
Baths
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature
ofWork
FR/ Replacing the rear door off the kitchen with a 6. patio door. A code compliant header will be installed. The patio door will exit onto
he existing deck. Installing a smaller window in the existing window space in the kitchen area. The header is existing.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuat~
Issued By: L\
$1.500.00 Plan Approval ~O.OO Permit Fee Paid
$26.00 Park Dedication
$0.00
Date 03/30/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0400370000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity. ~
Signature Da ~- ¿()- ô ¿,
Agent/Owner
OSHKOSH
WI 54901 - 0000 Telephone Number
Address
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.