Loading...
HomeMy WebLinkAbout0118698-Building (roof) 0 OSHKOSH ON THE WATER Job Address 617619 STERLING AVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 118698 Owner STEPHEN D MERCER Create Date 03/29/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----.!:> Sq. Ft. ----.!:> Sq. Ft. Rooms Height 0 Ft. D Projection I Finished/Living Bedrooms 0 Stories Canopies ----.!:> Garage ----.!:> Sq. Ft. Baths Signs ----.!:> Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature DUPLEX / ADD 1 LAYER OF ROOFING TO THE EXISTING 1 LAYER ON HOUSE, NO STRUCTURAL CHANGES of Work HVAC Contractor Plumbing Contractor Electric Contractor $3,000.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Fees: Valuation Issued By: /??L\!} Date 03/29/2006 Final/O.P. 00/00/0000 D Permit Voided i Parcelld # 1107420000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any nece "ary a provais before sta 'ng such activity. Signature /£(.- £:J . ~ / gent/Owner Date 3/z'f/zooCo Address 9447 N OAKWOOD AVE NEENAH WI 54956 - 0000 Telephone Number ;lls- b2;ß To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.