HomeMy WebLinkAbout2006-Building (roof)
0
OSHKOSH
ON THE WATER
Job Address 352 ROSALIA ST
CITY OF OSHKOSH
No
118697
BUILDING PERMIT - APPLICATION AND RECORD
Owner TIMOTHY J TURNER
Create Date
03/29/2006
Desi9ner
Contractor
OWNER
Category
141-ExteriorRemodeling
Plan
Type
. Building
0 Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
Zoning
Size
Unfinished/Basement
----2 Sq. Ft.
----2 Sq. Ft.
Rooms
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms 0
Stories
Canopies 0
Garage
----2 Sq. Ft.
Baths
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units --------'2
# Structures
--------'2
Use/Nature SFR / TEAR OFF & REPLACE EXISTING ROOFING ON HOUSE. NO STRUCTURAL CHANGES
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$9,000.00 Plan Approval
4:?¿,'¿J
$0.00 Permit Fee Paid
$68.00 Park Dedication
$0.00
Issued By:
Date 03/29/2006
Final/D.P. 00/00/0000
0 Permit Voided I
Parcelld # 0206480000
In the performance of this work I agree to perfonm all work pursuant to nules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and !9..$;CUr~~ssary approvals before starting such activity. 7 / . /
Signature ~-~ ;~ Date }/Z?/V ('
Agent/Owner
3'>2- ¡fJ.fdl
f¡?
Oshkosh
WI 54901 - 0000
Telephone Number
;<31-67'7"">'
Address
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.