RE:
FIRE PROTECTION SYSTEM INSTALLATION
OSHKOSHß'GosH-
PRIME OUTLET MALL
3'001 WASHBURN -1fféD
OSHKOSH, WISCONSIN 54904
AHERN FIRE PROTECTION WORK ORDER No. 992388
Dear Brian:
Enclosed is a copy of the Contractor's Material and Test Certificates covering the above-referenced
Fire Protection System Installation for your files.
Very truly yours,
AHERN FIRE PROTECTION
A division of 1. F. Ahem Co.
Odf ¿f~
JeffR Battennan
Service Superintendent
JRB/ksj
LCITYO3,2I-O6.DOC
An Equal Opportunity Employer
AHERN FIRE PROTECTION
Contractor's Material and Test Certificate for Aboveground Piping
PROCEDURE
Upon complef;on of wolf<, inspection and tests shall be made by Ihe conlraclor's representative and wllnessad by an owner's representative. All def- shall be
corrected and system left In se/VIce before contractor's personnel finally ieave Ihe job.
A certìfocale shall be filled oul and signed by both representatIves. CopIes shall be prepared for approvIng aulhomles, ownelS, and contractor. II is understood Ihe
:;;.~~;=:::::: :;~:'~~~7n:~=: prejudices any claim against conlractor for faulty malerial, poor worl<manship, or failure 10 comply with approving
PROPERTY NAME Oshkosh B'Gosh I Prime Outlet Mall AFP Wo. #: 992388 I DATE: March 9, 2006
PROPERTY ADDRESS 3001 Washburn Oshkosh, WI 54904
ACCEPTED BY APPROVING AUTHORITIES (NAMES)
1. City of Oshkosh (Building Inspector -- Brian Noe)
2. Oshkosh Fire Department (Battalion Chief -- Stu Schrottky)
3.
4.
ADDRESS
Plans 1. 215 Church Avenue -- PO Box 1130 -- Oshkosh, WI 54901
2. 101 Court Street -- Oshkosh, WI 54901
3.
4.
INSTALLATION CONFORMS TO ACCEPTED PLANS 1J~ES ONO
EQUIPMENT USED IS APPROVED YES ONO
IF NO, EXPLAIN DEVIATIONS
HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION fJ YES ONO
OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT?
INSTRUCTIONS IF NO, EXPLAIN
HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES:
Item No.'s2 &."'" 1. SYSTEM COMPONENTS INSTRUCTION J~ES ONO
belo~nledbyAFP 2. CARE AND MAINTENANCE INSTRUCTIONS YES ONO
atoloseouttime.
3. NFPA 25 YES ONO
LOCATION OF SUPPLIES BUILDINGS I
SYSTEM Space #8060
MAKE MODEL YEAR OF K- QUANTITY TEMPERATURE
MANUFACTURE FACTOR RATING
VII.n Microfasl QR VK3O2 Pendenl112" Chrome 2005 5.6 84 155
V;~n" Micromalio Sid. VK100 Uoriohl112" Brass 2005 S.6 1 200 Oeo.
SPRINKLERS
PIPE AND TYPE OF PIPE Liahtwall Non-Threadable' Thinwall Threadable' Black
FITTINGS TYPE OF FITTINGS Plain-end' Thfeaded: Mechanical Tees
FLOW ALARM DEVICE MAXIMUM TIME TO OPERATE
THROUGH TEST CONNECTION
TYPE MAKE MODEL MIN. I SEC.
Existing I I I
N/A I I I
EXPLAIN ANY ALARM PROBLEMS:
ALARM
DEVICES LOW AIR ALARM DEVICE ALARM OPERATED
TYPE MAKE MODEL PRESSURE PROPERLY
I I SETTING PSI I
N/A YES NO
I
EXPLAIN ANY ALARM PROBLEMS:
I
CENTRAL MONITORING SIGNALS RECEIVED
ALARM SERVICE LOCATION(S)
OR PRESSURE
TYPE NAME OF REMOTE WATERFLOW SWITCH LOW-AIR OTHER
SERVICE DETECTOR FLOW SUPERVISORY
SUPERVISING LOCATION(S):
STATION
(ON-SITE)
REMOTE NAME OF SERVICE:
REMOTE MONITORING V
ALARM SERVICE ~ /hjCÒ
SIGNALING (OFF-SITE)
PHONE:
OTHER: LOCATION(S):
EXPLAIN ANY ALARM SIGNALING PROBLEMS:
DRY VALVE Q.O.D.
MAKE I MODEL SERIAL NO. MAKE I MODEL SERIAL NO.
I I 1 I
TIME TO TRIP WATER TRIP POINT AIR TIME WATER ALARM
THROUGH TEST PRESSURE AIR PRESSURE PRESSURE REACHEO TEST OPERATEO
CONNECTION'.' OUTLET '.' PROPERLY
o~ MIN. SEC. PSI PSI PSI MIN. I SEC. YES NO
OPE ING WITHOUT I I J
T T QO.D.
WITH I I I
Q.O.D.
IF NO, EXPLAIN:
OPERATION: 0 PNEUMATIC 0 ELECTRIC 0 HYDRAULIC
PIPING SUPERVISED DYES ONO I DETECTING MEDIA SUPERVISED DYES ONO
DOES VALVE OPERATE FROM THE MANUAL TRIP, REMOTE, OR BOTH CONTROL STATIONS DYES ONO
IS THERE AN ACCESSIBLE FACILITY IN EACH IF NO, EXPLAIN
1 CIRCUIT FOR TESTING
PREA N DYES ONO
VA E
DOES EACH CIRCUIT DOES EACH CIRCUIT MAXIMUM TIME TO
OPERATE SUPERVISION
MAKE MODEL LOSS ALARM OPERATE VALVE RELEASE OPERATE RELEASE
YES I NO YES NO MIN. SEC.
I
LOCATION & MAKE & MODEL SETTING STATIC PRESSURE RESIDUAL PRESSURE
FLOOR (FLOWING) FLOW RATE
Ø:
RE CING INLET I OUTLET INLET I OUTLET FLOW
VA EST (PSI) (PSI) (PSI) (PSI) íGPM)
-' I
I
Ahern Fire Protection
, MEASURED FROM TIME INSPECTORS TEST CONNECTION IS OPENED.
'NFPA 13 ONLY REQUIRES THE 6O-SECOND LIMITATION IN SPECIFIC SECTIONS.
2
TEST
DESCRIPTION
TESTS
BLANK
TESTING
GASKETS
WELDING
Ahern Fire Protection
ROSTATIC: lalic lests shall be made al not less than 200 psI (13.6 balS) forlwo houlS m 50 psi (3.4 balS) above sialic p'e5SUre In
psi (10.2 ba,,)fmlwo houlS. Dilfe.-ential dry-pipe valve clappelS shall be left open during tesl to prevent damage. All
aboveground pipIng leakage shall be stopped.
PNEUMATIC: Establish 4I}.psi (2.7 balS) air pressure and measure drop, which shall nolexceed 1-1/2 psi (0.1 balS) in 24 houlS. Tesl
pressurelanks al normal water level and air pressure and measure air pressure drop, wh'ch shall nol exceed 1-1/2 psI (0.1 balS) in 24 houlS.
ALL PIPING HYDROSTATICALLY TESTED AT I <--Bar) for - HRS.
DRY PIPING PNEUMATICALLY TESTED DYES ô1m-
EQUIPMENT OPERATES PROPERLY ""!:r'I'Es 0 NO
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS, SODIUM
SILICATE OR DERIVATIVES OR SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMICALS WERE NOT USED
FOR TESTING SYSTEMS OR STOPPING LEAKS?
YES ONO
DRAIN READING OF GAUGE LOCATED..t:!§i\R WATER RESIDUAL PRESSURE WITH.1/ALVE IN TEST
TEST SUPPLY TEST CONNECTION:------LYPSI (_Bar) CONNECTION OPEN WIDE:~ PSI LBar)
UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISER OTHER EXPLAIN
FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING.
VERIFIED BY COpy OF THE CONTRACTOR'S MATERIAL AND TEST ¡1At--
CERTIFICATE FOR UNDERGROUND PIPING. 0 YES 0 NO
FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING 0 YES 0 NO
IF POWDER-DRIVEN FASTENERS ARE USED IN CONCRETE, HAS
REPRESENTATIVE SAMPLE TESTING BEEN SATISFACTORILY COMPLETED?
NÞ4- 0 YES 0 NO
LOCATIONS
YES ONO
IFYES--.
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING
PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS B2.1?
DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS
QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS B2.1?
DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A
DOCUMENTED QUALITY CONTROL PROCEDURE TO ENSURE THAT ALL DISCS
ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND
OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL
DIAMETERS OF PIPING ARE NOT PENETRATED?
SIGNATURES
DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN:
NAME OF SPRINKLER CONTRACTOR
AHERN FIRE PROTECTION, 201 MORRIS COURT - FOND DU LAC, WI 54935
TESTS WITNESSED BY
TITLE
~./~
TITLE
",~cA.
3
IF NO, STATE REASON
IF NO, EXPLAIN
NUMBER REMOVED
fYES
rES
rES
ONO
ONO
ONO
ONO