Loading...
HomeMy WebLinkAbout2006-Fire Protection System Intall , ~ Ahern Fire Protection A d;vision of J. F. Ahern Co. 201 Morns Court, P.O. Box 1316. Fond du Lac, WI 54936.1316 TEL (920) 921.9020 . FAX (920) 921.8666 . www.ahemfire.com Wisconsin' Illinois' Missouri, Nebraska' Iowa' Minnesota MAR 2 2 2006 DEPARTMENT OF DEiJELO PM nJT March 21,2006 Building Inspector -- Brian Noe City of Oshkosh 215 Church Avenue -- PO Box 1130 Oshkosh, WI 54901 T -920/236-5051 F-920/236-1130 RE: FIRE PROTECTION SYSTEM INSTALLATION OSHKOSHß'GosH- PRIME OUTLET MALL 3'001 WASHBURN -1fféD OSHKOSH, WISCONSIN 54904 AHERN FIRE PROTECTION WORK ORDER No. 992388 Dear Brian: Enclosed is a copy of the Contractor's Material and Test Certificates covering the above-referenced Fire Protection System Installation for your files. Very truly yours, AHERN FIRE PROTECTION A division of 1. F. Ahem Co. Odf ¿f~ JeffR Battennan Service Superintendent JRB/ksj LCITYO3,2I-O6.DOC An Equal Opportunity Employer AHERN FIRE PROTECTION Contractor's Material and Test Certificate for Aboveground Piping PROCEDURE Upon complef;on of wolf<, inspection and tests shall be made by Ihe conlraclor's representative and wllnessad by an owner's representative. All def- shall be corrected and system left In se/VIce before contractor's personnel finally ieave Ihe job. A certìfocale shall be filled oul and signed by both representatIves. CopIes shall be prepared for approvIng aulhomles, ownelS, and contractor. II is understood Ihe :;;.~~;=:::::: :;~:'~~~7n:~=: prejudices any claim against conlractor for faulty malerial, poor worl<manship, or failure 10 comply with approving PROPERTY NAME Oshkosh B'Gosh I Prime Outlet Mall AFP Wo. #: 992388 I DATE: March 9, 2006 PROPERTY ADDRESS 3001 Washburn Oshkosh, WI 54904 ACCEPTED BY APPROVING AUTHORITIES (NAMES) 1. City of Oshkosh (Building Inspector -- Brian Noe) 2. Oshkosh Fire Department (Battalion Chief -- Stu Schrottky) 3. 4. ADDRESS Plans 1. 215 Church Avenue -- PO Box 1130 -- Oshkosh, WI 54901 2. 101 Court Street -- Oshkosh, WI 54901 3. 4. INSTALLATION CONFORMS TO ACCEPTED PLANS 1J~ES ONO EQUIPMENT USED IS APPROVED YES ONO IF NO, EXPLAIN DEVIATIONS HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION fJ YES ONO OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT? INSTRUCTIONS IF NO, EXPLAIN HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES: Item No.'s2 &."'" 1. SYSTEM COMPONENTS INSTRUCTION J~ES ONO belo~nledbyAFP 2. CARE AND MAINTENANCE INSTRUCTIONS YES ONO atoloseouttime. 3. NFPA 25 YES ONO LOCATION OF SUPPLIES BUILDINGS I SYSTEM Space #8060 MAKE MODEL YEAR OF K- QUANTITY TEMPERATURE MANUFACTURE FACTOR RATING VII.n Microfasl QR VK3O2 Pendenl112" Chrome 2005 5.6 84 155 V;~n" Micromalio Sid. VK100 Uoriohl112" Brass 2005 S.6 1 200 Oeo. SPRINKLERS PIPE AND TYPE OF PIPE Liahtwall Non-Threadable' Thinwall Threadable' Black FITTINGS TYPE OF FITTINGS Plain-end' Thfeaded: Mechanical Tees FLOW ALARM DEVICE MAXIMUM TIME TO OPERATE THROUGH TEST CONNECTION TYPE MAKE MODEL MIN. I SEC. Existing I I I N/A I I I EXPLAIN ANY ALARM PROBLEMS: ALARM DEVICES LOW AIR ALARM DEVICE ALARM OPERATED TYPE MAKE MODEL PRESSURE PROPERLY I I SETTING PSI I N/A YES NO I EXPLAIN ANY ALARM PROBLEMS: I CENTRAL MONITORING SIGNALS RECEIVED ALARM SERVICE LOCATION(S) OR PRESSURE TYPE NAME OF REMOTE WATERFLOW SWITCH LOW-AIR OTHER SERVICE DETECTOR FLOW SUPERVISORY SUPERVISING LOCATION(S): STATION (ON-SITE) REMOTE NAME OF SERVICE: REMOTE MONITORING V ALARM SERVICE ~ /hjCÒ SIGNALING (OFF-SITE) PHONE: OTHER: LOCATION(S): EXPLAIN ANY ALARM SIGNALING PROBLEMS: DRY VALVE Q.O.D. MAKE I MODEL SERIAL NO. MAKE I MODEL SERIAL NO. I I 1 I TIME TO TRIP WATER TRIP POINT AIR TIME WATER ALARM THROUGH TEST PRESSURE AIR PRESSURE PRESSURE REACHEO TEST OPERATEO CONNECTION'.' OUTLET '.' PROPERLY o~ MIN. SEC. PSI PSI PSI MIN. I SEC. YES NO OPE ING WITHOUT I I J T T QO.D. WITH I I I Q.O.D. IF NO, EXPLAIN: OPERATION: 0 PNEUMATIC 0 ELECTRIC 0 HYDRAULIC PIPING SUPERVISED DYES ONO I DETECTING MEDIA SUPERVISED DYES ONO DOES VALVE OPERATE FROM THE MANUAL TRIP, REMOTE, OR BOTH CONTROL STATIONS DYES ONO IS THERE AN ACCESSIBLE FACILITY IN EACH IF NO, EXPLAIN 1 CIRCUIT FOR TESTING PREA N DYES ONO VA E DOES EACH CIRCUIT DOES EACH CIRCUIT MAXIMUM TIME TO OPERATE SUPERVISION MAKE MODEL LOSS ALARM OPERATE VALVE RELEASE OPERATE RELEASE YES I NO YES NO MIN. SEC. I LOCATION & MAKE & MODEL SETTING STATIC PRESSURE RESIDUAL PRESSURE FLOOR (FLOWING) FLOW RATE Ø: RE CING INLET I OUTLET INLET I OUTLET FLOW VA EST (PSI) (PSI) (PSI) (PSI) íGPM) -' I I Ahern Fire Protection , MEASURED FROM TIME INSPECTORS TEST CONNECTION IS OPENED. 'NFPA 13 ONLY REQUIRES THE 6O-SECOND LIMITATION IN SPECIFIC SECTIONS. 2 TEST DESCRIPTION TESTS BLANK TESTING GASKETS WELDING Ahern Fire Protection ROSTATIC: lalic lests shall be made al not less than 200 psI (13.6 balS) forlwo houlS m 50 psi (3.4 balS) above sialic p'e5SUre In psi (10.2 ba,,)fmlwo houlS. Dilfe.-ential dry-pipe valve clappelS shall be left open during tesl to prevent damage. All aboveground pipIng leakage shall be stopped. PNEUMATIC: Establish 4I}.psi (2.7 balS) air pressure and measure drop, which shall nolexceed 1-1/2 psi (0.1 balS) in 24 houlS. Tesl pressurelanks al normal water level and air pressure and measure air pressure drop, wh'ch shall nol exceed 1-1/2 psI (0.1 balS) in 24 houlS. ALL PIPING HYDROSTATICALLY TESTED AT I <--Bar) for - HRS. DRY PIPING PNEUMATICALLY TESTED DYES ô1m- EQUIPMENT OPERATES PROPERLY ""!:r'I'Es 0 NO DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS, SODIUM SILICATE OR DERIVATIVES OR SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TESTING SYSTEMS OR STOPPING LEAKS? YES ONO DRAIN READING OF GAUGE LOCATED..t:!§i\R WATER RESIDUAL PRESSURE WITH.1/ALVE IN TEST TEST SUPPLY TEST CONNECTION:------LYPSI (_Bar) CONNECTION OPEN WIDE:~ PSI LBar) UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISER OTHER EXPLAIN FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING. VERIFIED BY COpy OF THE CONTRACTOR'S MATERIAL AND TEST ¡1At-- CERTIFICATE FOR UNDERGROUND PIPING. 0 YES 0 NO FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING 0 YES 0 NO IF POWDER-DRIVEN FASTENERS ARE USED IN CONCRETE, HAS REPRESENTATIVE SAMPLE TESTING BEEN SATISFACTORILY COMPLETED? NÞ4- 0 YES 0 NO LOCATIONS YES ONO IFYES--. DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS B2.1? DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS B2.1? DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A DOCUMENTED QUALITY CONTROL PROCEDURE TO ENSURE THAT ALL DISCS ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL DIAMETERS OF PIPING ARE NOT PENETRATED? SIGNATURES DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN: NAME OF SPRINKLER CONTRACTOR AHERN FIRE PROTECTION, 201 MORRIS COURT - FOND DU LAC, WI 54935 TESTS WITNESSED BY TITLE ~./~ TITLE ",~cA. 3 IF NO, STATE REASON IF NO, EXPLAIN NUMBER REMOVED fYES rES rES ONO ONO ONO ONO DATE