HomeMy WebLinkAbout2006-Building (sprinklers)
G
OSHKOSH
ON THE WATER
Job Address 3001 S WASHBURN ST
CITY OF OSHKOSH
No
118728
BUILDING PERMIT - APPLICATION AND RECORD
OWner FIRST HORIZON GROUP LIMITED PTNSHP
Create Date
03/31/2006
Designer
Contractor
AHERN FIRE PROTECTION
Category
232 - Alteration Stores & Customer Service
Plan R6-08-0206-F
Type
. Building
0 Sign
Q Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
--
Unfinished/Basement
-----.2 Sq. Ft.
-----.2 Sq. Ft.
Rooms
Height
0 Ft.
D Projection I
Finished/LIving
Bedrooms
Stories
Canopies -----.2
Garage
-----.2 Sq. Ft.
Baths
0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units ---.------!1
# Structures
0
Use/Nature
ofWork
60 - Oshkosh B' Gosh, Alterations of fire sprinkler system as per plans.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$16,000.00 Plan Approval
$0.00 Permit Fee Paid
$104.00 Park Dedication
$0.00
Issued By:
Date 03/31/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1329420000
in the perfonmance of this work I agree to perfonm all work pursuant to ruies governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a parry, if you perform the work
described in this permit appiication within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 201 Morris Court
Agent/Owner
Fond du Lac
WI 54936 - 0000
Telephone Number
920-921-9020
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.