Loading...
HomeMy WebLinkAbout2006-Building (sprinklers) G OSHKOSH ON THE WATER Job Address 3001 S WASHBURN ST CITY OF OSHKOSH No 118728 BUILDING PERMIT - APPLICATION AND RECORD OWner FIRST HORIZON GROUP LIMITED PTNSHP Create Date 03/31/2006 Designer Contractor AHERN FIRE PROTECTION Category 232 - Alteration Stores & Customer Service Plan R6-08-0206-F Type . Building 0 Sign Q Canopy 0 Fence 0 Raze Zoning Class of Const: Size -- Unfinished/Basement -----.2 Sq. Ft. -----.2 Sq. Ft. Rooms Height 0 Ft. D Projection I Finished/LIving Bedrooms Stories Canopies -----.2 Garage -----.2 Sq. Ft. Baths 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units ---.------!1 # Structures 0 Use/Nature ofWork 60 - Oshkosh B' Gosh, Alterations of fire sprinkler system as per plans. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $16,000.00 Plan Approval $0.00 Permit Fee Paid $104.00 Park Dedication $0.00 Issued By: Date 03/31/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1329420000 in the perfonmance of this work I agree to perfonm all work pursuant to ruies governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a parry, if you perform the work described in this permit appiication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 201 Morris Court Agent/Owner Fond du Lac WI 54936 - 0000 Telephone Number 920-921-9020 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.