Loading...
HomeMy WebLinkAbout0118725-Building (alterations) 0 OSHKOSH ON THE WATER Job Address 501 E PARKWAY AVE CITY OF OSHKOSH No 118725 BUILDING PERMIT - APPLICATION AND RECORD OWner BOYS AND GIRLS CLUB OSHKOSH INC Create Date 03/30/2006 Designer Contractor CR MEYER Category 229 - Alteration Schools & other Educational Plan Type . Buildin9 Q Si9n 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement --2 Sq. Ft. Rooms Finished/Living --2 Sq. Ft. Bedrooms Garage --2 Sq. Ft. Baths Height 0 Ft. 0 Projection I Stories Canopies 0 Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature ofWork Combine 4 classrooms into 2 classrooms. Create one hour rated storage room adjacent to kitchen by partltionln9 off a portion of the r¡--- HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $0.00 Permit Fee Paid $127.00 Park Dedication $0.00 Issued By: Date 03/31/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0404890000 In the perfonmance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party. if you perform the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to see ny n ssary approv efore starting such actvity. Date '3 -~I-"'~ Signature Address 895 W 20TH AVE AgenUOwner OSHKOSH WI 54902 - 0000 Telephone Number 920-235-3350 x219 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.