HomeMy WebLinkAbout0118742 P
e
OSHKOSH
ON THE WATER
Job Address 2823 NEWPORT AVE
CITY OF OSHKOSH
No
118742
PLUMBING PERMIT - APPLICATION AND RECORD
Owner ELROY W/BERNICE POST
Create Date 03/31/2006
Contractor D R GLAZE PLUMBING
Category 410- Residential-Interior
Plan
Bathtub 0 Shower 0 Water Softner 0 Wail.SI. 0 Shamp Sink 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0
Res. Sink 1 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Use/Nature ,INSTALL NEW KITCHEN SINK "CHECK #3980
of Work
Coffee Maker ~
Int Grease Trap ~
Ex! Grease Trap ~
RPZ Valve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Size
Material
Type
#
0
0
0
0
0
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
0
0
0
0
0
Parcelld #
1332830000
Valuation
$500.00
Plan Approval
$0.00
Permit Fees
$20.00 0 Pennit Voided I
Issued By
Date 03/31/2006
In the perlonnance of this work, I agree to perlonn all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perlonn the work
described in this pennit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 1865 JAMES RD
Agent/Owner
OSHKOSH
WI 54904 - 0000
Telephone Number 920-589-4014
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.