Loading...
HomeMy WebLinkAbout0118742 P e OSHKOSH ON THE WATER Job Address 2823 NEWPORT AVE CITY OF OSHKOSH No 118742 PLUMBING PERMIT - APPLICATION AND RECORD Owner ELROY W/BERNICE POST Create Date 03/31/2006 Contractor D R GLAZE PLUMBING Category 410- Residential-Interior Plan Bathtub 0 Shower 0 Water Softner 0 Wail.SI. 0 Shamp Sink 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 Res. Sink 1 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature ,INSTALL NEW KITCHEN SINK "CHECK #3980 of Work Coffee Maker ~ Int Grease Trap ~ Ex! Grease Trap ~ RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Size Material Type # 0 0 0 0 0 Conn. Type Sanitary Sewer Storm Sewer Water Service 0 0 0 0 0 Parcelld # 1332830000 Valuation $500.00 Plan Approval $0.00 Permit Fees $20.00 0 Pennit Voided I Issued By Date 03/31/2006 In the perlonnance of this work, I agree to perlonn all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perlonn the work described in this pennit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1865 JAMES RD Agent/Owner OSHKOSH WI 54904 - 0000 Telephone Number 920-589-4014 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.