Loading...
HomeMy WebLinkAbout0118738-Plumbing (clothes wshr) 0 OSHKOSH ON THE WATER Job Address 2655 MONTCLAIR PL Contractor FREEMONT PLUMBING & HEATING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By CITY OF OSHKOSH No 118738 0 0 0 0 0 0 0 0 0 Water Softner Local Waste Clothes Wshr Owner KEITH A SPARR Category 410 - Residential-Interior 0 0 1 0 0 0 0 0 0 Wail.SI. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink PLUMBING PERMIT - APPLICATION AND RECORD Plan Approval 0 0 0 0 0 0 0 0 0 0 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn $0.00 Permit Fees Create Date 03/31/2006 Plan 0 Shamp Sink ----2 0 FlrlWst Sink 0 0 Catch Basin 0 0 Wash Ftn 0 0 Urinal 0 0 Standp Rec 1 0 Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Ejector/Grind FRI Expanding a 1st floor closet to provide room for a stackable washer/dryer. Install Standpipe and water supply. Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 Parcelld # 0 1319240000 $20.00 0 Permit Voided I Date 03/31/2006 in the performance of this work, I agree to perform all work pursuant to ruies governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit appiicant to contact the easement ho d secur any n ssa'¥ approvals before starting such activity. Signature Address PO BOX216 genUOwner FREEMONT WI 54940 - 0000 Date!} -5/~ðb Telephone Number 920-446-3656 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.