HomeMy WebLinkAbout0118724-Building (siding)
e
OSHKOSH
ON THE WATER
Job Address 1227 EASTMAN ST
CITY OF OSHKOSH
No
118724
BUILDING PERMIT - APPLICATION AND RECORD
Owner LEONARD L PLACE
Create Date
03/31/2006
Designer
Contractor
LUECKS HOME IMPROVEMENT INC
Category
141-ExteriorRemodeling
Plan
Type
. Building
0 Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
Zoning
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
0
Height 0 Ft.
0 Projection!
Canopies 0
Finished/Living
Bedrooms
Stories
Garage
~Sq.Ft.
Baths
Signs
~
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
-----
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units 0
# Structures
0
Use/Nature
ofWork
SFRI Replacing steel siding with steel siding. and wraping window openings - J. blocks previously installed. no EIV provided - Any
I ,~.,~. œ""~ '" "- -"
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$14,000.00 Plan Approval
$0.00 Permit Fee Paid
$94.00 Park Dedication
$0.00
Issued By:
Date 03/31/2006
Finat/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1506640000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 706 S MAIN STREET
AgenUOwner
OSHKOSH
WI 54902 - 6084
Telephone Number
235-0106
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified oth&rwise, we will assume the project is ready at the time the request is received. Work may
continue if th& inspection is not performed within two business days from the time the project is ready.