Loading...
HomeMy WebLinkAbout0118724-Building (siding) e OSHKOSH ON THE WATER Job Address 1227 EASTMAN ST CITY OF OSHKOSH No 118724 BUILDING PERMIT - APPLICATION AND RECORD Owner LEONARD L PLACE Create Date 03/31/2006 Designer Contractor LUECKS HOME IMPROVEMENT INC Category 141-ExteriorRemodeling Plan Type . Building 0 Sign 0 Canopy Class of Const: 0 Fence 0 Raze Zoning Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms 0 Height 0 Ft. 0 Projection! Canopies 0 Finished/Living Bedrooms Stories Garage ~Sq.Ft. Baths Signs ~ Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other ----- Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature ofWork SFRI Replacing steel siding with steel siding. and wraping window openings - J. blocks previously installed. no EIV provided - Any I ,~.,~. œ""~ '" "- -" HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $14,000.00 Plan Approval $0.00 Permit Fee Paid $94.00 Park Dedication $0.00 Issued By: Date 03/31/2006 Finat/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1506640000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 706 S MAIN STREET AgenUOwner OSHKOSH WI 54902 - 6084 Telephone Number 235-0106 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified oth&rwise, we will assume the project is ready at the time the request is received. Work may continue if th& inspection is not performed within two business days from the time the project is ready.