Loading...
HomeMy WebLinkAbout0118703-Building "0 OSHKOSH ON THE WATER Job Address 113BALDWINAVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 118703 OWner JAMES B/AMY K FIELDER Create Date 03/29/2006 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class 01 Const: Size UnlinishediBasement --2 Sq, Ft. Rooms 0 Height 0 Ft Finished/Living --2 Sq. Ft. Bedrooms 0 Stories Garage --2 Sq. Ft. Baths 0 D Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ~ Use/Nature FRI Remodeling the 2nd floor to create three bedrooms and 1 bathroom. All construction shall comply with local and state building code olWork requirements. HVAC Contractor UNKNOWN??? Plumbing Contractor UNKNOWN Electric Contractor UNKNOWN???? Fees: Valu~tio~, ~ Issued By: ~ $3,000.00 Plan Approval ~ $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 03/29/2006 Final/O.P. 00/00/0000 D Penmit Voided I Parcelld # 1001640000 In the performance 01 this work I agree to perform all work pursuant to rules governing the described construction. While the City 01 Oshkosh has no authority to enforce easement restrictions 01 which it is not a party, il you perfonm the work described in this permit a lication within an easeme t, the City strongly urges the penmit applicant to contact the easement. holder(s) and to see rting such activity. Date r3/¿i/œ- Signature .~ K:/ AgenVOwner ( WINNEBAGO WI 54985 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.