Loading...
HomeMy WebLinkAbout0118693-Building (windows) 0 OSHKOSH ON THE WATER Job Address 2012 SHERIDAN ST CITY OF OSHKOSH No 118693 BUILDING PERMIT - APPLICATION AND RECORD Owner STEVEN E LEHMAN Create Date 03/28/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence Q Raze Zoning Class of Const: Size Unfinished/Basement ------.2 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living -~ Sq. Ft. Bedrooms 0 Stories Garage ------.2 Sq. Ft. Baths 0 D Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Siab 0 Concrete Biock 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature of Work FRiinstaii 8 repiacement (same size & location) windows: Work to be done by David Bamick. NO STRUCTURAL WORK. --------- HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4.880.00 Plan Approval Issued By: ~--- $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Date 03/28/2006 Final/O.P. DO/DO/DODO D Permit Voided I Parcelld # 1215470000 In the performance of this work I agree to perform ali work pursuant to rules governing the described construction. While the City of Oshkosh has no autl1ority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary appr vals before starting such activity. Signature Date 3-;;kf-()f::, Address 2012 SHERIDAN ST OSHKOSH WI 54901 - 2183 Telephone Number d~~- &,q h. 2.. To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may' continue if the inspection is not performed within two business days from the time the project is ready.