HomeMy WebLinkAbout0118693-Building (windows)
0
OSHKOSH
ON THE WATER
Job Address 2012 SHERIDAN ST
CITY OF OSHKOSH
No
118693
BUILDING PERMIT - APPLICATION AND RECORD
Owner STEVEN E LEHMAN
Create Date
03/28/2006
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
Q Raze
Zoning
Class of Const:
Size
Unfinished/Basement ------.2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living -~ Sq. Ft. Bedrooms 0 Stories
Garage ------.2 Sq. Ft. Baths 0
D Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Siab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature
of Work
FRiinstaii 8 repiacement (same size & location) windows: Work to be done by David Bamick. NO STRUCTURAL WORK.
---------
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation $4.880.00 Plan Approval
Issued By: ~---
$0.00 Permit Fee Paid
$44.00 Park Dedication
$0.00
Date 03/28/2006
Final/O.P. DO/DO/DODO
D Permit Voided I
Parcelld # 1215470000
In the performance of this work I agree to perform ali work pursuant to rules governing the described construction.
While the City of Oshkosh has no autl1ority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary appr vals before starting such activity.
Signature
Date 3-;;kf-()f::,
Address 2012 SHERIDAN ST
OSHKOSH
WI 54901 - 2183
Telephone Number d~~- &,q h. 2..
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may'
continue if the inspection is not performed within two business days from the time the project is ready.