HomeMy WebLinkAbout0118681 B
e
OSHKOSH
ON THE WATER
Job Address 1120-1128 N MAIN ST
CITY OF OSHKOSH
No
118681
BUILDING PERMIT - APPLICATION AND RECORD
Owner PHAN XIONG
Create Date
03/27/2006
Designer
Contractor
XIONG PRO-ROOFING
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
---------2 Sq. Ft.
---------2 Sq. Ft.
Rooms
0
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies 0
Garage
---------2 Sq. Ft.
Baths
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Penmit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature
of Work
OMM/instailing a rubberized roof over a rear 20'x20' flat roof. No additional load, installation of foam, or structural modifications will be
one.
Plumbing Contractor
HVAC Contractor
Electric Contractor
Fees: Valuation \--.-
Issued By: \ >If^-
$1,832.32 Plan Approval
$0.00 Penmit Fee Paid
$26.00 Park Dedication
$0.00
Date 03/27/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1003680000
In the perfonmance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work
described In this permit application within an easement, the City strongiy urges the penmit applicant to contact the easement
holder(s) and to cessary approvals before starting such activity.
.---
Agent/Owner
MADISON
Date"rJ,2:;2-6
Signature
Address 14 BOOK COURT
"^"'- 53713 - 0000 Telephone Number
608-345-6816
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.