Loading...
HomeMy WebLinkAbout0118670-Building (windows) e OSHKOSH ON THE WATER Job Address 310lDAHOST CITY OF OSHKOSH No 118670 BUILDING PERMIT - APPLICATION AND RECORD Owner CARMEN ZAMUDIO Create Date 03/27/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms Stories Baths 0 0 Pier 0 Other 0 Treated Wood Size Zoning Unfinished/Basement ----------2 Sq.Ft. ----------2 Sq. Ft. 0 Projection I Finished/Living Garage ----------2 Sq. Ft. Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature of Work FR/lnstalling 8 replacement windows (same size and location). HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~ $2.000.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Date 03/27/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0602760000 In the performance of this work I agree to perform all work pursuant to rules governing the described constructon. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to se e any nec.essary approvals befor~ starting such actvity. 3/d'7 I Signature ~ ~ Date~ '/O¡:; , AgenVOwner Address 310 IDAHO ST OSHKOSH WI 54902 - 5821 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.