Loading...
HomeMy WebLinkAbout0118673 P ~ OSHKOSH ON THE WATER Job Address 154 W 24TH AVE CITY OF OSHKOSH No 118673 PLUMBING PERMIT -APPLICATION AND RECORD 0 0 1 0 0 0 0 0 0 0 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Contractor HANSON QUALITY PLUMBING Owner JESSE J/MELISSA DECKER Plan Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures 1 0 0 0 1 0 0 0 0 Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Category 410 - Residential-Interior 0 0 0 0 0 0 0 0 0 WaitSt Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Create Date 07/07/2005 0 0 0 0 0 0 0 0 0 Shamp Sink ~ FlrlWst Sink 0 Catch Basin 0 Wash Ftn 0 Urinal 0 Standp Rec 0 Ice Maker 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZValve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Sterilizer Dip Well Drink Ftn Fixture and appliance not included on permit # 114230"DEBIT ACCT PER SHARON 3/21/06 Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 Parcelld # 0 1403390000 Use/Nature of Work Valuation Issued By $600.00 Plan Approval $0.00 Permit Fees $21.00 0 Permit Voided I Date 03/27/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date 730-0205 Address 550 N BLUEMOUND RD AgenUOwner APPLETON WI 54914 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.