Loading...
HomeMy WebLinkAbout0118671-Plumbing (repair leak) e OSHKOSH ON THE WATER Job Address 427 W 10TH AVE CITY OF OSHKOSH No 118671 PLUMBING PERMIT - APPLICATION AND RECORD Contractor KURT ZENTNER & SONS INC Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner ELAINE G JANKE Category 401 - Residential-Exterior (laterals) Create Date 03/24/2006 Plan 0 0 0 0 0 0 0 0 0 Water Softner 0 Local Waste 0 Clothes Wshr 0 Bidet 0 Beer Tap 0 Lab Sink 0 Sterilizer 0 Dip Well 0 Drink Ftn 0 WaitSt. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 Shamp Sink 0 0 FlrlWst Sink 0 0 Catch Basin 0 0 Wash Ftn 0 0 Urinal ~ 0 Standp Rec 0 0 Ice Maker ~ 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap ~ RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Bathtub 0 Whirlpool 0 Lavatory 0 Toilet 0 Res. Sink 0 Bar Sink 0 Water Heater 0 Site Drain 0 Roof Drain 0 Misc. 0 Fixtures Use/Nature 'Repair of water service for Inside leak (work done without notice for inspection.)"debit acct of Work Sanitary Sewer Size Material Storm Sewer Water Service 3/4" lead Copper $0.00 Permit Fees Date 03/27/2006 Valuation $800.00 Plan Approval Issued By Type # 0 0 0 0 0 Conn. Type 1 0 0 0 0 $50.00 0 Permit Voided I Lateral Repair Parcelld # 0906380000 In the performance of this work. I agree to perform ali work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Telephone Number 235-1340 Address 2860 OREGON ST AgenVOwner OSHKOSH WI 54902 - 0000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.