HomeMy WebLinkAbout0118671-Plumbing (repair leak)
e
OSHKOSH
ON THE WATER
Job Address 427 W 10TH AVE
CITY OF OSHKOSH
No
118671
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor KURT ZENTNER & SONS INC
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Owner ELAINE G JANKE
Category 401 - Residential-Exterior (laterals)
Create Date 03/24/2006
Plan
0
0
0
0
0
0
0
0
0
Water Softner 0
Local Waste 0
Clothes Wshr 0
Bidet 0
Beer Tap 0
Lab Sink 0
Sterilizer 0
Dip Well 0
Drink Ftn 0
WaitSt.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
0 Shamp Sink 0
0 FlrlWst Sink 0
0 Catch Basin 0
0 Wash Ftn 0
0 Urinal ~
0 Standp Rec 0
0 Ice Maker ~
0 Gar Drain 0
0 Soda Disp 0
Coffee Maker 0
Int Grease Trap 0
Ext Grease Trap ~
RPZ Valve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Bathtub 0
Whirlpool 0
Lavatory 0
Toilet 0
Res. Sink 0
Bar Sink 0
Water Heater 0
Site Drain 0
Roof Drain 0
Misc. 0
Fixtures
Use/Nature 'Repair of water service for Inside leak (work done without notice for inspection.)"debit acct
of Work
Sanitary Sewer
Size
Material
Storm Sewer
Water Service
3/4" lead
Copper
$0.00
Permit Fees
Date 03/27/2006
Valuation
$800.00
Plan Approval
Issued By
Type
#
0
0
0
0
0
Conn. Type
1
0
0
0
0
$50.00 0 Permit Voided I
Lateral
Repair
Parcelld #
0906380000
In the performance of this work. I agree to perform ali work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Telephone Number
235-1340
Address 2860 OREGON ST
AgenVOwner
OSHKOSH
WI 54902 - 0000
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.