Loading...
HomeMy WebLinkAbout0118663 B 0 OSHKOSH ON THE WATER Job Address 2451 PATRIOT LN CITY OF OSHKOSH No 118663 BUILDING PERMIT - APPLICATION AND RECORD Owner HAROLD F/BERNIC PUTZER Create Date 03/24/2006 Designer Contractor OWNER Category 140 -Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms Stories Garage ~Sq.Ft. Baths 0 0 Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ---'2 Use/Nature ofWork ondo (2451)1 Remodeling the basement to create a rec room and bathroom. Replacing the garage fioor due to fioor drain installations nd replacing the existing decking on the deck with composite material. HVAC Contractor UNKNOWN??? Plumbing Contractor SALM PLUMBING Electric Contractor UNKNOWN???? Fees: Valuation $16,557.00 Plan Approval $0.00 Permit Fee Paid $109.00 Park Dedication $0.00 Issued By: Date 03/24/2006 Final/O.P. DO/DO/DODO 0 Permit Voided I Parcelld # 1621640301 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2455 PATRIOT LN Agent/Owner OSHKOSH WI 54904 - 0000 Telephone Number 426-2008 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. a.Lj5\ ~DTu--J CL~' f.----- I ~ I---~-~-~ .£l ¡- ~~.l£ <J) '<t ~ ~ ~ Co ~ ~~~ .9 --------- !P :;¡: (") Co ,- " I}:'!. V 0 J:; Oø' --- /¿/Z Á ~ ' l-----.U -----.1-- I l -~~,\7~~----~J ~~.9l--~- ~