Loading...
HomeMy WebLinkAbout0118649-Building e OSHKOSH ON THE WATER Job Address 547 OAK ST CITY OF OSHKOSH No 118649 BUILDING PERMIT - APPLICATION AND RECORD Owner ROBERT J SCHRAA REV TRUST Create Date 03/23/2006 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 Size Zoning Unfinished/Basement ~Sq.Ft. ~Sq.Ft. 0 Projection I Canopies 0 Finished/Living Garage ~Sq.Ft. Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature SFR/ Remodeling the 2nd floor bathroom. updating the kitchen. repairing the stairway. and installing a replacement window. of Work HVAC Contractor Plumbing Contractor UNKNOWN Electric Contractor CUMINGS ELECTRIC INC Fees: valuati"(i', Issued By: ~\Y"-../ $20,000.00 Plan Approval $0.00 Permit Fee Paid $124.00 Park Dedication $0.00 Date 03/23/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1102940000 In the performance of this work I agree to perfonn all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature l ~ £; ,tA../~ ~nuOwner Address 1856 FLORiDA DR FORT WAYNE IN 46805 - 0000 Telephone Number Date t.p To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.