Loading...
HomeMy WebLinkAbout0118642-Building (roof) ~ OSHKOSH ON THE WATER Job Address 518 OHIO ST CITY OF OSHKOSH No 118642 BUILDING PERMIT - APPLICATION AND RECORD Owner JOHN J LEMBERGER Create Date 03/23/2006 Designer Contractor DNR ENTERPRISES INC Category 141-ExteriorRemodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ------.2 Sq. Ft. Rooms FinishedlLiving ------.2 Sq. Ft. Bedrooms Garage ------.2 Sq. Ft. Baths Height ------.2 Ft. D Projection I Stories Canopies Signs Foundation . Poured Concrete 0 Fioating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain ~ # Dwelling Units 0 Height Permit Park Dedication # Structures -----.2 UselNature COMMI Re-roofing the building, installing asphalt shingles. ofWork HVAC Contractor Plumbing Contractor Electric Contractor Fees: ValUati°j , Issued By: ~ Jr--, $4,800.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Date 03123/2006 FinaIIO.P.~ D Permit Voided I Parcelld # 0600450000 in the performance of this work I agree to perform all work pursuant to rules governing the described ccnstruction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application' hin an easement, the City strongly urges the permit applicant to ccntact the easement holder(s) and to cure a s ary a provals before starting such activity. &. . Signature Date ð. 'ÍJ Agent/Owner Address 14 OSHKOSH WI 54901 - 0000 Telephone Number 0-236-9253 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.