HomeMy WebLinkAbout0118644 B
0
OSHKOSH
ON THE WATER
Job Address 1017WNEWYORKAVE
CITY OF OSHKOSH
No
118644
BUILDING PERMIT - APPLICATION AND RECORD
Owner NANCY J PUGH
Create Date
03/23/2006
Designer
Contractor
OWNER
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
0
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
~Sq.Ft.
Baths
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
# Structures
Use/Nature
ofWork
# Dwelling Units 0
~
Park Dedication
FRI Remodeling the kitchen, installing new insulation, drywail, cabinets, and countertops. This permit does not include plumbing or
lectrical work. No wails wiil be moved.
HVAC Contractor
Plumbing Contractor
UNKNOWN
Electric Contractor
UNKNOWN????
Fees: valuat~
Issued By: ~
$10,000.00 Plan Approval
$0.00 Permit Fee Paid
$74.00 Parik Dedication
$0.00
Date 03/23/2006
Final/D.P. 00/00/0000
0 Permit Voided I
Parcelld # 0502690000
In the performance of this work I agree to perform ail work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary provais before starting such activity.
AJ U
AgenVOwner
OSHKOSH
Date ¡d-d s. ~
Signature
WI 54901 - 3643
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.