Loading...
HomeMy WebLinkAbout0118644 B 0 OSHKOSH ON THE WATER Job Address 1017WNEWYORKAVE CITY OF OSHKOSH No 118644 BUILDING PERMIT - APPLICATION AND RECORD Owner NANCY J PUGH Create Date 03/23/2006 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms 0 Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies Garage ~Sq.Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit # Structures Use/Nature ofWork # Dwelling Units 0 ~ Park Dedication FRI Remodeling the kitchen, installing new insulation, drywail, cabinets, and countertops. This permit does not include plumbing or lectrical work. No wails wiil be moved. HVAC Contractor Plumbing Contractor UNKNOWN Electric Contractor UNKNOWN???? Fees: valuat~ Issued By: ~ $10,000.00 Plan Approval $0.00 Permit Fee Paid $74.00 Parik Dedication $0.00 Date 03/23/2006 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 0502690000 In the performance of this work I agree to perform ail work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary provais before starting such activity. AJ U AgenVOwner OSHKOSH Date ¡d-d s. ~ Signature WI 54901 - 3643 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.