HomeMy WebLinkAbout0118637-Building (bathroom)
e
OSHKOSH
ON THE WATER
Job Address 1710 BOWEN ST
CITY OF OSHKOSH No 118637
BUILDING PERMIT - APPLICATION AND RECORD
OWner DEBRA L KAHUT Create Date 03/23/2006
--
Designer
Contractor
JIM BAUER CARPENTRY AND CONSTRUCTIO
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence-
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
--2 Sq. Ft.
--2 Sq. Ft.
Rooms
Height
0 Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies --2
Garage
--.2 Sq. Ft.
Baths
Signs
--2
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
--
# Dwelling Units ---------.2
# Structures
_--.!1
Park Dedication
Use/Nature SFRI Replacing drywall and tub surround. No structural work. Mike Sammons is the general contractor for this project.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
$500.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
c5(l
Date 03/23/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1510860000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 6825 FRONTIER RD
AgenUOwner
WINNECONNE
WI 54986 - 0000
Telephone Number
920-582-7740
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.