Loading...
HomeMy WebLinkAbout0118637-Building (bathroom) e OSHKOSH ON THE WATER Job Address 1710 BOWEN ST CITY OF OSHKOSH No 118637 BUILDING PERMIT - APPLICATION AND RECORD OWner DEBRA L KAHUT Create Date 03/23/2006 -- Designer Contractor JIM BAUER CARPENTRY AND CONSTRUCTIO Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence- 0 Raze Zoning Class of Const: Size Unfinished/Basement --2 Sq. Ft. --2 Sq. Ft. Rooms Height 0 Ft. D Projection I Finished/Living Bedrooms Stories Canopies --2 Garage --.2 Sq. Ft. Baths Signs --2 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit -- # Dwelling Units ---------.2 # Structures _--.!1 Park Dedication Use/Nature SFRI Replacing drywall and tub surround. No structural work. Mike Sammons is the general contractor for this project. of Work HVAC Contractor Plumbing Contractor Electric Contractor $500.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Fees: Valuation Issued By: c5(l Date 03/23/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1510860000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 6825 FRONTIER RD AgenUOwner WINNECONNE WI 54986 - 0000 Telephone Number 920-582-7740 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.