HomeMy WebLinkAbout0118605-Building (garage; driveway)
e
OSHKOSH
ON THE WATER
Job Address 707 DOVE ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
118605
Owner EDWARD WOMASKI JR
Create Date
03/22/2006
Designer
Contractor
DAN V BINDER CONSTRUCTION
Category
141 - Exterior Remodeling
Plan
--
Type
. Buiiding
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms Stories
Baths 0
Size
Zoning
~-
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
D Projection I
Finished/Living
Canopies 0
Garage
~Sq.Ft.
Signs
0
Foundation
. Poured Concrete 0 Fioating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units --~
# Structures
----'2
Use/Nature SFRI Re-frame NE corner of detached garage to create additional driveway ciearance as per site plan.
ofWork
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$400.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Issued By:
Date 03/22/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1603710000
In the performance of this work i agree to perform all work pursuant to ruies governing the described construction.
Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvais before starting such activity.
Signature
Date
Address 1224 W SOUTH PARK AVE
Agent/Owner
OSHKOSH
Wi 54902 - 0000
Telephone Number
231-2114
To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
.
.