Loading...
HomeMy WebLinkAbout0118605-Building (garage; driveway) e OSHKOSH ON THE WATER Job Address 707 DOVE ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 118605 Owner EDWARD WOMASKI JR Create Date 03/22/2006 Designer Contractor DAN V BINDER CONSTRUCTION Category 141 - Exterior Remodeling Plan -- Type . Buiiding 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms Stories Baths 0 Size Zoning ~- Unfinished/Basement ~Sq.Ft. ~Sq.Ft. D Projection I Finished/Living Canopies 0 Garage ~Sq.Ft. Signs 0 Foundation . Poured Concrete 0 Fioating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units --~ # Structures ----'2 Use/Nature SFRI Re-frame NE corner of detached garage to create additional driveway ciearance as per site plan. ofWork HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $400.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 03/22/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1603710000 In the performance of this work i agree to perform all work pursuant to ruies governing the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvais before starting such activity. Signature Date Address 1224 W SOUTH PARK AVE Agent/Owner OSHKOSH Wi 54902 - 0000 Telephone Number 231-2114 To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. . .