HomeMy WebLinkAbout0118591 P
e
OSHKOSH
ON THE WATER
Job Address 725 MONROE ST
Contractor M P KELLY
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
0
0
0
1
0
0
0
0
0
0
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
CITY OF OSHKOSH
No
118591
PLUMBING PERMIT - APPLICATION AND RECORD
$434.80
Plan Approval
Owner LILLIAN E MILLER
Category 410 - Residential-Interior
0 WaterSoftner 0
0 Local Waste 0
0 Clothes Wshr 0
~ Bidet 0
0 Beer Tap 0
0 Lab Sink 0
0 Sterilizer 0
0 DipWell 0
0 Drink Ftn 0
Wai!.S!.
Ice Chest
Exam Sink
Scúlry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Create Date 03/21/2006
Plan
0
0
0
0
0
0
0
0
0
Shamp Sink ~
FlrlWst Sink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
Standp Rec 0
Ice Maker 0
Gar Drain 0
Soda Disp 0
Coffee Maker ~
Int Grease Trap ~
Ext Grease Trap 0
RPZValve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
REPLACE WATER CLOSET ..CHECK #7651
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0 Parcelld #
0 1107730000
Use/Nature
ofWork
Valuation
Issued By
$0.00
Permit Fees
Date 03/21/2006
$20.00 0 Permit Voided I
In the perfonnanee of this work. I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement, the City strongly urges the penni! applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 665 N MAIN ST
AgenVOwner
OSHKOSH
WI 54901 - 4431
Telephone Number
231-1750
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.