Loading...
HomeMy WebLinkAbout0118591 P e OSHKOSH ON THE WATER Job Address 725 MONROE ST Contractor M P KELLY Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures 0 0 0 1 0 0 0 0 0 0 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind CITY OF OSHKOSH No 118591 PLUMBING PERMIT - APPLICATION AND RECORD $434.80 Plan Approval Owner LILLIAN E MILLER Category 410 - Residential-Interior 0 WaterSoftner 0 0 Local Waste 0 0 Clothes Wshr 0 ~ Bidet 0 0 Beer Tap 0 0 Lab Sink 0 0 Sterilizer 0 0 DipWell 0 0 Drink Ftn 0 Wai!.S!. Ice Chest Exam Sink Scúlry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Create Date 03/21/2006 Plan 0 0 0 0 0 0 0 0 0 Shamp Sink ~ FlrlWst Sink 0 Catch Basin 0 Wash Ftn 0 Urinal 0 Standp Rec 0 Ice Maker 0 Gar Drain 0 Soda Disp 0 Coffee Maker ~ Int Grease Trap ~ Ext Grease Trap 0 RPZValve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 REPLACE WATER CLOSET ..CHECK #7651 Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 Parcelld # 0 1107730000 Use/Nature ofWork Valuation Issued By $0.00 Permit Fees Date 03/21/2006 $20.00 0 Permit Voided I In the perfonnanee of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the penni! applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST AgenVOwner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.