Loading...
HomeMy WebLinkAbout0118587-Plumbing (sump pump) e CITY OF OSHKOSH No 118587 OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 12051207 JOSSLYN ST Owner GEORGE B SCHNEIDER Create Date 03/21/2006 Contractor MPKELLY Category 410 - Residential-Interior Plan Bathtub 0 Shower 0 Water softner 0 Wail.sl. 0 Shamp Sink ~ Coffee Maker 0 Whirlpool 0 Floor Drain 0 Local Waste ~ Ice Chest 0 FlrlWst Sink ~ Int Grease Trap 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Toilet 0 Disposal ~ Bidet ~ sculry Sink 0 Wash Ftn ~ RPZValve 0 Res. Sink ~ Dishwasher ~ BeerTap ~ Hand Sink 0 Urinal -----2 Eye Wash statn 0 Bar Sink ~ Sump Pump ~1 Lab Sink ~ Plaster Sink 0 standp Rec ~ Wtr Sewer Mtrs 0 Water Heater ~ Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker ~ Deduct Meters 0 Site Drain 0 Breakrm Sink 0 Dip Well ~ F Prep Sink 0 Gar Drain ~ Wtr Usage Mtrs 0 Roof Drain ~ Ejector/Grind 0 Drink Ftn 0 serv Sink 0 Soda Disp 0 Misc. 0 Fixtures UseiNature of Work Valuation Issued By REPLACE CLEARWATER SUMP PUMP AT 1207 JOssL YN "CHECK #7651 Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 Parcelld # 0 1604751100 $368.00 $0.00 $20.00 0 Permit Voided I Permit Fees Plan Approval Date 03/21/2006 In the performance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pariy, if you perform the work described in this permit appiication within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvais before starting such activity. Address 665 N MAIN ST Signature Date AgenUOwner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.