Loading...
HomeMy WebLinkAbout0118572-Building (siding) e OSHKOSH ON THE WATER Job Address 910 CEAPE AVE CITY OF OSHKOSH No 118572 BUILDING PERMIT - APPLICATION AND RECORD OWner GRANT D/HEATHER HARMS Create Date 03/21/2006 Designer Contractor HUISMAN HOMES Category 141-ExteriorRemodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -------.2 sq, Ft. Rooms 0 Height 0 Ft. Finished/Living -------.2 Sq. Ft. Bedrooms 0 Stories Garage -------.2 Sq. Ft. Baths 0 0 Projection I Canopies Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Biock 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature SFR/ Replacing aluminum siding with vinyl. No structural work. Owner will be re- installing eiectricai devices. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $6,500.00 Plan Approval $0.00 Permit Fee Paid $56.00 Park Dedication Issued By: ~~ $0.00 Date 03/21/2006 Final/D.P. 00/00/0000 0 Penmit Voided I Parcelld # 0802060000 In the perfonmance of this work I agree to perform ail work pursuant to rules govemlng the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement :~~dn:::~:nd2~~s~~~rting such activity, Date ~ -z,lzl } 0(0 Agent/Owner I Address 3342 LOUISE CT OSHKOSH WI 54901 - 0000 Telephone Number 426-1003 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.