Loading...
HomeMy WebLinkAbout0118595-Plumbing (toilet) ~ OSHKOSH ON THE WATER Job Address 2690BADGERAVE CITY OF OSHKOSH No 118595 PLUMBING PERMIT - APPLICATION AND RECORD Owner OSHKOSH WAREHOUSE LLC Create Date 03/21/2006 Contractor M P KELLY Category 440 - Industrial-Interior Plan Bathtub 0 Shower 0 Water Softner 0 WaitSt 0 Shamp Sink 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Toilet 1 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature REPLACE WATER CLOSET AT 2450 S OAKWOOD RD "CHECK #7651 of Work Coffee Maker ~ Int Grease Trap ~ Ext Grease Trap ~ RPZValve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Type # 0 0 0 0 0 Size Material Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1329100101 $20.00 D Permit Voided I $892.00 Plan Approval --~ Permit Fees Valuation Issued By Date 03/21/2006 In the perfonmance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pariy, if you perfonm the work described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST AgenUOwner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.