Loading...
HomeMy WebLinkAbout0118564 P e OSHKOSH ON THE WATER Job Address 519521 N MAIN ST CITY OF OSHKOSH No 118564 PLUMBING PERMIT -APPLICATION AND RECORD Owner LARRY J BACKUS Create Date 03/20/2006 Contractor KOCH PLUMBING Category 410 - Residential-Interior Plan Bathtub 1 Shower 0 WaterSoflner 0 Wait St. 0 Shamp Sink 0 - Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Lavatory 1 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Toilet 1 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 Res. Sink 1 Dishwasher 0 Beer Tap 0 Hand Sink 0 Urinal 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 PlasterSink 0 Standp Rec 0 Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Coffee Maker 0 Int Grease Trap ----.J:I Ext Grease Trap ----.J:I RPZValve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Use/Nature of Work REMOVE & REPLACE PLBG FIXTURES ì~~"'M Size Material Type # 0 0 0 0 0 Conn. Type Sanitary Sewer Storm Sewer Water Service Valuation $1,000.00 Plan Approval $0.00 Permit Fees 0 0 0 0 0 $28.00 D Permit Voided I Parcelld # 0700320000 Issued By Date 03/20/2006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2005 DOTY ST AgenVOWner OSHKOSH WI 54902 - 0000 Telephone Number 920-231-6661 or 235 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.