Loading...
HomeMy WebLinkAbout0118566-Building (renew permit) ~ OSHKOSH ON THE WATER Job Address 127 BROCKWAY AVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 118566 OWner JAY G/ANGELA S STENGEL Create Date 03/20/2006 Designer Contractor OWNER Category 140 -Interior Remodeiing Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -----.2 Sq. Ft. Rooms 0 Height 0 Ft. FinishediLiving -----.2 Sq. Ft. Bedrooms 0 Stories Garage -----.2 Sq. Ft. Baths 0 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Fioating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain - Height Permit Park Dedication # Dwelling Units 0 # Structures ~ Use/Nature ofWork FRI Renew permit #111162 for remodeiing the basement to include a family/game room. Smoke detectors will be required to be I '-'00 ... ., - -'... . moo' "- - ",,"- "œ . ~ ~'M .0" "'-' HVAC Contractor Plumbing Contractor Electric Contractor Fees: valuati] Issued By: ~ ~ $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 03/20/2006 Final/O.P. 00/00/0000 0 PenmitVoided I Parcelld # 1401660000 Signature In the performance of this work i agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the penmit appiicant to contact the easement holder(s) and to secure any necessary approvals bel ng such activity. Dar-2O~{" WI 54902 - 6943 Telephone Number Address To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.