Loading...
HomeMy WebLinkAbout0118547 B e OSHKOSH ON THE WATER Job Address 213 N lARK ST CITY OF OSHKOSH No 118547 BUILDING PERMIT - APPLICATION AND RECORD Owner WilliAM D S GREENWALD LIVING TRU Create Date 03/17/2006 Designer Contractor MJD FOUNDATION SOLUTIONS INC ----- Category 141 - Exterior Remodeling Plan Type . Building _O~~ 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~ Sq. Ft. Rooms 0 Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies 0 Garage ~Sq.Ft. Baths -- Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ----2 # Structures ----2 Use/Nature SFR/ Repairing all walls of the existing foundation. The City of Oshkosh is not responsible for the design of this repair. All repairs shall of Work be made in accordance with all applicabie codes and standards. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation ----114,000.00 Plan Approval - $0.00 Permit Fee Paid -- $94.00 Park Dedication $0.00 Issued By: ~ Date 03/17/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0609010000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to se""", any necessary approvals before starting such activity. ~-=- Signature / ~ Agent/Owner Date x3 ~g¡7-o~ Address 2100 AMERICAN DR NEENAH WI 54956 - 0000 Telephone Number 734-8653 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.