HomeMy WebLinkAbout0118547 B
e
OSHKOSH
ON THE WATER
Job Address 213 N lARK ST
CITY OF OSHKOSH
No
118547
BUILDING PERMIT - APPLICATION AND RECORD
Owner WilliAM D S GREENWALD LIVING TRU
Create Date
03/17/2006
Designer
Contractor
MJD FOUNDATION SOLUTIONS INC
-----
Category
141 - Exterior Remodeling
Plan
Type
. Building _O~~
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~ Sq. Ft.
Rooms
0
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies 0
Garage
~Sq.Ft.
Baths
--
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ----2
# Structures
----2
Use/Nature SFR/ Repairing all walls of the existing foundation. The City of Oshkosh is not responsible for the design of this repair. All repairs shall
of Work be made in accordance with all applicabie codes and standards.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation ----114,000.00 Plan Approval - $0.00 Permit Fee Paid -- $94.00 Park Dedication
$0.00
Issued By:
~
Date 03/17/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0609010000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to se""", any necessary approvals before starting such activity.
~-=-
Signature / ~
Agent/Owner
Date
x3 ~g¡7-o~
Address 2100 AMERICAN DR
NEENAH
WI 54956 - 0000
Telephone Number
734-8653
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.