Loading...
HomeMy WebLinkAbout0118549-Plumbing (kitchen sink) e OSHKOSH ON THE WATER Job Address 260 N CAMPBELL RD #B Contractor J RASMUSSEN PLUMBING INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures CITY OF OSHKOSH PLUMBING PERMIT. APPLICATION AND RECORD 0 0 0 0 1 0 0 0 0 0 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner FRANK J/JULIE E RUSSO Category 410 - Residential-Interior 0 0 0 0 0 0 0 0 0 Water softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Use/Nature CONDO / REPLACE KITCHEN SINK of Work Valuation Issued By Sanitary Sewer Storm Sewer Water Service $500.00 Plan Approval Size $0.00 0 0 0 0 0 0 0 0 0 Wai!.s!. Ice Chest Exam Sink sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 Shamp Sink 0 0 FlrlWst Sink 0 ---'> Catch Basin 0 0 Wash Ftn 0 ---'> Urinal ." 0 0 standp Rec ""0 0 Ice lI'!¡>ker ----;;.-.JJ 0 Gar Drain ,'0 ---'> 's~d~ Disp ~ '^' ~'" "" "" Type Conn. Type Material Permit Fees "0 0 ',.' $20.od~D Permit Voided I ,""III: M... In the performance of this work, I agree to perform all work pursuant to rules governing the described cpnstructlon. While the City of Oshkosh has no authority to enforce easement restrictions of which It Is not a party, œÿou perform the work described in this permit application within an easement, the City strongly urges the permit applicant to corlact the easement holder(s) and to secure any necessary approvals before starting such activity. ' "¡¡"'Iif ;;¡;w' Signature Address 1914 GREENBRIAR TRL AgenUOwner OSHKOSH WI 54904 - 0000 Date þ', Te¡~~'h~ne Number No Create Date 03/17/2006 Plan 118549 Coffee Maker 0 Int Grease Trap ---'> Ext Grease Trap 0 RPZValve 0 Eye Wash statn 0 Wtr Sewer Mtrs 0 Deduct Meters ---'> Wtr Usage Mtrs 0 Parcelld # 0608040228 "'" Date 920-233-6747 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do $~ain entry), your Name and Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time th,,'project is ready. 'f" ,W ,." .JI.