Loading...
HomeMy WebLinkAbout0118544 P ~ OSHKOSH ON THE WATER Job Address 313 E PARKWAY AVE CITY OF OSHKOSH No 118544 PLUMBING PERMIT. APPLICATION AND RECORD Owner CHRISTOPHER R ROGERS/S A SIMON Create Date 03/16/2006 Contractor PLUMB-RITE PLUMBING LLC Category 411 - Residential-Water Heaters Plan Bathtub 0 Shower 0 Water Softner 0 Wai!.S!. 0 Shamp Sink ~ Coffee Maker 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0 Lavatory 0 Lndry Tray 0 Clothes Wshr ~ Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn ~ RPZ Valve 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn ~ Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0 Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker ~ Deduct Meters 0 Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn ~ Serv Sink ~ Soda Disp 0 Misc. 0 Fixtures Use/Nature of Work I~-,"æ.' Size Material Type # 0 0 0 0 0 0 0 0 0 0 Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0403430000 Valuation $530.00 Plan Approval $0.00 Permit Fees $20.00 0 Permit Voided I Issued By Date 03/16/2006 In the perfonnance of this work, I agree to perfonn ail work pursuant to rules governing the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the pennit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature Date Address W9055 CTY RD AS AgenUOwner OAKFIELD WI 53065 - 0000 Telephone Number home 583-2379 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.