Loading...
HomeMy WebLinkAbout0118527 B e OSHKOSH ON THE WATER Job Address 208 OXFORD AVE CITY OF OSHKOSH No 118527 BUILDING PERMIT. APPLICATION AND RECORD OWner MELISSA P HERSHBERGER Create Date 03/15/2006 Designer Contractor PRECISION CONTRACTORS, INC. Category 140 - Interior Remodeiing Plan Type . Building 0 Sign Q Canopy 0 Fence 0 Raze Zoning Class of Const: Size -~ Unfinished/Basement ~Sq.Ft. Rooms a Height ~ Ft. Finished/Living ~Sq.Ft. Bedrooms Stories Garage ~ Sq. Ft. Baths a 0 Projection I Canopies a Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Use/Nature SFRI ADVOCAP REHAB/ install 5 vinyl windows and storm windows, three storm doors, tub surround, gutters and downspouts, and a of Work handrail to the basement. The house will also be re-roofed, (complete tear off). # Dwelling Units a # Structures a Park Dedication HVAC Contractor Plumbing Contractor Electric Contractor SECKAR ELECTRIC CO INC Fees: Valuation Issued By: \ .Jì\:4 $9,362.00 Plan Approval $0.00 Permit Fee Paid $74.00 Park Dedication $0.00 Date 03/15/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0403850000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement holder(s) and to secure aJJ&cess~:IS before starting such activity. 3-- /6- Oþ Signature y /~ ' -s-- Date l /J "AgenUOwner l Address 1938 SHERIDAN STREET OSHKOSH WI 54901 - 0000 Telephone Number (920) 426-2505 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.