HomeMy WebLinkAbout0118512-Building (interior remodel)
0
OSHKOSH
ON THE WATER
Job Address 1009 JEFFERSON ST
CITY OF OSHKOSH
No
118512
BUILDING PERMIT. APPLICATION AND RECORD
Owner TERRENCE R B KESLER/BRAD A KALLEN
Create Date
03/14/2006
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ---------2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ---------2 Sq. Ft. Bedrooms Stories
Garage ---------2 Sq. Ft. Baths 0
0 Projection I
Canopies 0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
----.!1
~:~~ ~~ure 1::1: ~7ho ~~r~e ~ ~ ~~~ ~I ~~~nu~ r~h~.;~ ~ ~ ~ do~ ~~ ~;~ ~~ ~ 7~ ~~~: ~~~i~~ ~~a ~ i ~ ~~~r~~te~itc~ ~n :a7 i~ ~~ ~~~~~:; I ~lt~C~ ~ ~ ~j~ s hall
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation $6.000.00 Plan Approval
Issued By: ~
$0.00 Permit Fee Paid
$50.00 Park Dedication
$0.00
Date 03/14/2006
Final/D.P. 00/00/0000
0 Permit Voided I
Parcelld # 1001380000
In the performance of this work I agree to perform ail work pursuant to ruies governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any ne, 6' iessary ap, ' :;ä!.$;1>~ starting such activity. . ~
->c- j/~ ,// //~I /
Signature )<... '~L~ ,/ .,~ - Date x: J(IY ~b
Agent/Owner
Address PO BOX 106
BUTTE DES MORT WI 54927 - 0106
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.