HomeMy WebLinkAbout0118508-Building (convert to single family)
G
OSHKOSH
ON THE WATER
Job Address 229FULTONAVE
CITY OF OSHKOSH
No
118508
BUILDING PERMIT - APPLICATION AND RECORD
OWner STEPHEN P INGERSOLL
Create Date
03/14/2006
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths
0 Projection
Canopies
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ----.2
# Structures
0
UselNature Duplex! Converting the current duplex to a single family residence. THE OWNER WAS INFORMED THAT IN ORDER TO CONVERT
of Work BACK TO A DUPLEX IN THE FUTURE THE PROPERTY WOULD HAVE TO MEET CURRENT CODE STANDARDS AT THAT TIME. A
fvall will be removed in the living room.
HVAC Contractor
Plumbing Contractor
Electric Contractor
:::S~d :::uatio~
$800.00 Plan Approval -~ Permit Fee Paid
$20.00 Park Dedication
$0.00
Date 03/14/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1000230000
In tI1e performance of this work I agree to perform all work pursuant to rules governing tI1e described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. If you perform tI1e work
described in tI1ls permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to se ny necessary approv efore starting such activity.
Signature :x
AgenUOwner
OSHKOSH
Date X
Address 22
'!'f.I. 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.