Loading...
HomeMy WebLinkAboutZoning-Drainage/Erosion Control CITY OF OSHKOSH DEPARTMENr OF PUBLIC WORKS 215 Church Aveuue P.O. Box 1130 Oshkosh, Wisconsin 54903-1130 ~ OfHKOfH ONm,WA'" (920) 236-5065 November 2,2005 Mr. Michael J. Welch, E.I.T. Davel Engineering 1811 Racine Street Menasha, WI 54952 Re: CS Smet Construction Corp Site (545 High Ave)/Drainage, Grading, & Erosion Control Plan Review Dear Mr. Welch: The Drainage, Grading, and Erosion Control Plans (Date: November 1, 2005) for the proposed CS Smet Construction Parking Lot Reconstruction at 545 High Avenue has been reviewed and approved. The Contractor should note that if concrete pavement restoration is not completed prior to the final paving date set by the City of Oshkosh, a temporary asphalt patch will need to be installed through the winter and the Contractor will need to return in the spring to complete the concrete pavement restoration. Sincerely, Jason Brown Civil Engineer II Cc: David C. Patek, Director of Public Works Scott Erickson, Asst. Director of Public Works Ed Potempa, Civil Engineer II