MARCH 14, 2006
06-87
RESOLUTION
(CARRIED 6-0
LOST
LAID OVER
WITHDRAWN
PURPOSE:
AWARD BID / ROAD MATERIALS /2006
INITIATED BY:
PURCHASING DIVISION
WHEREAS, the City of Oshkosh has heretofore advertised for bids for road
materials for 2006; and
WHEREAS, upon the opening and tabulation of bids, it appears that the following
is the most advantageous bid:
MCC, INC.
PO Box 1137
Appleton, WI 54912-1137
Hot Mix Asphalt - Picked up 5T. more/less
Binder Per ton Alternate = 28.75t + 4.25tk= 33.00
MICHELS CORPORATION
700 Tullar Road
Neenah, WI 54956
Breaker Run 6" - 1,000 T. more or less:
-- Delivered -- Alternate
Breaker Run 3" - 2,000 T. more or less:
-- Delivered - Alternate
1 1/4" base course - 3,000 T. more or less:
- Delivered -- Alternate
3/4" base course -- 3,000 T. more or less:
- Delivered -- Alternate
3/4" clear stone -- 1,000 T. more or less:
- Delivered -- Alternate
1 1/2" clear stone - 1,000 T. more or less:
- Delivered -- Alternate
3" clear stone - 1,000 T. more or less:
- Delivered -- Alternate
Sealcoat Chips - 2,500 T. more or less:
-- Delivered - Primary
7.70
7.80
7.80
7.80
8.75
8.75
9.75
8.80
MARCH 14, 2006
06-87
Ready-Mix Concrete 1000 CY more/less:
5,000 PSI per C.Y. - Alternate
9 bag HI EARLY -- Alternate
Fill Sand 200 T. - Delivered-Alternate
NORTH EAST ASPHALT INC.
W6380 Design Drive
Greenville, WI 54942
RESOLUTION
CONT'D
69.00
77.00
11.10
Hot Mix Asphalt - Picked up - 5,OOOT. more/less:
Binder per ton Primary = $28.50L + 2.55tk = 31.05
Surface per ton Primary = $30.00L + 2.55tk = 32.55
Alternate = $30.75CS+3.4Otk= 34.15
VULCAN MATERIAL CO.
1301 Knapp Street
Oshkosh, WI 54902
Breaker Run 6" - 1,000 T. more or less
-- Picked up Primary = 5.25t + 1. 7Otk=
Breaker Run 3" - 2,000 T. more or less
-- Picked up Primary = 5.50 + 1.7Otk =
1 1/4" base course - 3,000 T. more or less
-- Picked up Primary = 5.50 + 1.7Otk =
3/4" base course - 3,000 T. more or less
-- Picked up Primary = 5.50 + 1.7Otk =
3/4" clear stone - 1,000 T. more or less
-- Picked up Primary = 6.65. + 1.7Otk =
1 1/2" clear stone - 1,000 T. more or less
-- Picked up Primary = 6.65+ 1.7Otk =
3" clear stone - 1,000 T. more or less
-- Picked up Primary = 7.55+ 1.7Otk =
ZILLGES MATERIALS
1800 Fountain Ave.
Oshkosh, WI 54904
6.95
7.20
7.20
7.20
8.35
8.35
9.25
Fill Sand 200 T.
- Picked up - Primary = $3.25 + 1.7Otk=4.95
- Delivered - Primary = 8.10
MARCH 14, 2006
06-87
RESOLUTION
CONT'D
CAREW CONCRETE
1811 W. Edgewood Dr.
Appleton, WI 54913
Ready-mix Concrete 1000 CY more/less:
Class C 3/4" State Mix - Alternate
4,000 PSI PER C.Y. -- Alternate
7,000 PSI PER C.Y. -- Alternate
Slurry 1,000 TNS more/less - Primary
Portland Cement 100 bags - Primary
Masonry Sand 50 YDS - Picked up - Alternate
69.50
65.00
78.50
40.501T
7.45/bg
15.35
4x CONCRETE
2974 Green Hill Court
Oshkosh, WI 54904
Ready-mix Concrete 1000 CY more/less: m
Class C 3/4" State Mix - Primary
4,000 PSI Per C.Y. - Primary
5,000 PSI Per C.Y. - Primary
7,000 PSI PER C.Y. -- Primary
Slurry 1,000 TNS more/less - Alternate
9 bag HI EARLY -- Primary
Portland Cement 100 bags - Alternate
Masonry Sand 50 YDS - Picked up -Primary
64.00
62.00
66.00
74.00
43.50
77.00
7.95/bg
13.95
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appropriate agreement for the purpose of same,
all according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from:
Acct. No.1 00-0430-6565-00000 - Street Dept. - Materials & Supplies
_.l=.!Q.Q-..lk-=_I~Id.«-~Ì!l9 Fee___.J
p = primary vendor a = alternate vendor
ROAD MATERIALS -2006
BIDS OPENED - MARCH 2, 2006
MCC Inc Michels Corporation North East Asphalt Inc Vulcan Materials Co Zillges Materials Carew Concrete 4x Concrete
DESCRIPTION PO Box 1137 700 Tullar Road W6380 Design Drive 1301 Knapp Street 1800 Fountain Ave 1811 W Edgewood Drive 2974 Green Hill Court
Appleton, WI 54912-1137 Neenah, WI 54956 Greenville WI 54942 - Oshkosh, WI 54902 Oshkosh WI 54904 Appleton WI 54913 Oshkosh Wi 54904
- ---_u_-----
BREAKER RUN 6" PICKED UP 3.40tk + 5.60 = 9.00 1.70tk + 5.25 = 6.95 " P
1,000 TONS MORE OR LESS DELIVERED $ A 7.70 $ /7.55 $ 9.25
BREAKER RUN 3" PICKED UP 3.4Otk + 5.70 = 9.10 1.7Otk+5.50=7.20 kb
2,000 TONS MORE OR LESS DELIVERED $ A- 7.80 $ 7.80 $ 9.25
1 1/4" BASE COURSE PICKED UP 3.4Otk + 5.70 = 9.10 1.70tk + 5.50 = 7.20 t. ~
3,000 TONS MORE OR LESS DELIVERED $ Pt 7.80 $ 7.80 $ 9.75
3/4" BASE COURSE PICKED UP 3.4Otk + 5.70 = 9.10 1.7Otk + 5.50 = 7.20 t..I rÞ
3,000 TONS MORE OR LESS DELIVERED $ Rr.. 7.80 $ 7.80 $ 9.75
3/4" CLEAR STONE PICKED UP 3.4Otk + 6.65 = 10.05 1.70tk + 6.65 = 8.35 II::>
1,000 TONS MORE OR LESS DELIVERED $ A 8.75 $ 8.95 $ 9.75
1 1/2" CLEAR STONE PICKED UP 3.40tk + 6.65 = 10.05 1.70tk + 6.65 = 8.35..11 Þ
1,000 TONS MORE OR LESS DELIVERED $ P>t. 8.75 $ 8.95 $ 9:75
3" CLEAR STONE PICKED UP .. 3.4Otk + 7.65 = 11.05 1.7Otk + 7.55 = 9.25 V ip
1,000 TONS MORE OR LESS DELIVERED $ 1>. 9.75 $ 9.85 $ 12.75
SEALCOATCHIPS PICKED UP 3.40tk + 6.70 = 10.10 NO BID
2,500 TONS MORE OR LESS DELIVERED $ P v 8.80
READY-MIX CONCRETE 1000 CY more/less I
CLASS C 3/4" STATE MIX $ 71.00 $ 1'=1 69.50 HI/V 64.00
4,000 PSI PER C.Y. $ 65.00 $ A 65.00 $[-' V 62.00
5,000 PSI PER C.Y $ A V 69.00 $ 69.50 $(:J r/ 66.00
7,000 PSI PER C.Y. $ f/ 78.50 $[J v'" 74.00
Slurry 1,000 TNS MORE/LESS $ 45.00 t' V $40.50/T A $43.50/T
9 BAG HI EARLY $ PI 77.00 $ 78.50 $ f V 77.00
Hot Water
Winter Service
Heat Charge Nov 1 - Mar 31 8.00/yd fuel surchg 1 O.OO/Id
MINIMUM DELIVERY CHARGE 80.00 under 4 yds/ Sat 7.00 70.00 under 4 yds
HOT MIX ASPHALT PICKED UP
5,000 TONS MORE OR LESS 4.25tk + 28.75 = 33.00 fA. 29.00CS + 4.40tk = 33.40/ P
Binder Per ton 28.50L + 2.55tk = 31.05
Surface per ton 4.251k + 30.00 = 34.35 30.00L + 2.55tk = 32.55 V.l
30.75CS+3.4Otk=34.15 "J>.
Portland Cement 1 00 BAGS - $9.00/bQ V' 1 $7.45/bQ M $7.95/ba
Masonry Sand 50 YDS PICKED UP 3.4Otk + 12.00 = 1<; 4n 1.7Otk + 22.00 = 23.70 1.70tk + 13.65 -15.35 V;fj. 1.70tk+ 12.25= 1þ95 V
DELIVERED 14:A'0', - - $ 24.00 $ . 17.15
Fill Sand 200 TONS PICKED UP 3.40tk + 9.00 = 12.40 V 1.7Otk + 3.25 - 4:r 1.70tk + 1)1.65 = 12.35
DELIVERED 11.10 1\. . $ 17" 8.10
~<- u'"---,-- ,--- -- ,
I