Loading...
HomeMy WebLinkAbout06-87.doc MARCH 14, 2006 06-87 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN PURPOSE: AWARD BID / ROAD MATERIALS /2006 INITIATED BY: PURCHASING DIVISION WHEREAS, the City of Oshkosh has heretofore advertised for bids for road materials for 2006; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: MCC, INC. PO Box 1137 Appleton, WI 54912-1137 Hot Mix Asphalt - Picked up 5T. more/less Binder Per ton Alternate = 28.75t + 4.25tk= 33.00 MICHELS CORPORATION 700 Tullar Road Neenah, WI 54956 Breaker Run 6" - 1,000 T. more or less: -- Delivered -- Alternate Breaker Run 3" - 2,000 T. more or less: -- Delivered - Alternate 1 1/4" base course - 3,000 T. more or less: - Delivered -- Alternate 3/4" base course -- 3,000 T. more or less: - Delivered -- Alternate 3/4" clear stone -- 1,000 T. more or less: - Delivered -- Alternate 1 1/2" clear stone - 1,000 T. more or less: - Delivered -- Alternate 3" clear stone - 1,000 T. more or less: - Delivered -- Alternate Sealcoat Chips - 2,500 T. more or less: -- Delivered - Primary 7.70 7.80 7.80 7.80 8.75 8.75 9.75 8.80 MARCH 14, 2006 06-87 Ready-Mix Concrete 1000 CY more/less: 5,000 PSI per C.Y. - Alternate 9 bag HI EARLY -- Alternate Fill Sand 200 T. - Delivered-Alternate NORTH EAST ASPHALT INC. W6380 Design Drive Greenville, WI 54942 RESOLUTION CONT'D 69.00 77.00 11.10 Hot Mix Asphalt - Picked up - 5,OOOT. more/less: Binder per ton Primary = $28.50L + 2.55tk = 31.05 Surface per ton Primary = $30.00L + 2.55tk = 32.55 Alternate = $30.75CS+3.4Otk= 34.15 VULCAN MATERIAL CO. 1301 Knapp Street Oshkosh, WI 54902 Breaker Run 6" - 1,000 T. more or less -- Picked up Primary = 5.25t + 1. 7Otk= Breaker Run 3" - 2,000 T. more or less -- Picked up Primary = 5.50 + 1.7Otk = 1 1/4" base course - 3,000 T. more or less -- Picked up Primary = 5.50 + 1.7Otk = 3/4" base course - 3,000 T. more or less -- Picked up Primary = 5.50 + 1.7Otk = 3/4" clear stone - 1,000 T. more or less -- Picked up Primary = 6.65. + 1.7Otk = 1 1/2" clear stone - 1,000 T. more or less -- Picked up Primary = 6.65+ 1.7Otk = 3" clear stone - 1,000 T. more or less -- Picked up Primary = 7.55+ 1.7Otk = ZILLGES MATERIALS 1800 Fountain Ave. Oshkosh, WI 54904 6.95 7.20 7.20 7.20 8.35 8.35 9.25 Fill Sand 200 T. - Picked up - Primary = $3.25 + 1.7Otk=4.95 - Delivered - Primary = 8.10 MARCH 14, 2006 06-87 RESOLUTION CONT'D CAREW CONCRETE 1811 W. Edgewood Dr. Appleton, WI 54913 Ready-mix Concrete 1000 CY more/less: Class C 3/4" State Mix - Alternate 4,000 PSI PER C.Y. -- Alternate 7,000 PSI PER C.Y. -- Alternate Slurry 1,000 TNS more/less - Primary Portland Cement 100 bags - Primary Masonry Sand 50 YDS - Picked up - Alternate 69.50 65.00 78.50 40.501T 7.45/bg 15.35 4x CONCRETE 2974 Green Hill Court Oshkosh, WI 54904 Ready-mix Concrete 1000 CY more/less: m Class C 3/4" State Mix - Primary 4,000 PSI Per C.Y. - Primary 5,000 PSI Per C.Y. - Primary 7,000 PSI PER C.Y. -- Primary Slurry 1,000 TNS more/less - Alternate 9 bag HI EARLY -- Primary Portland Cement 100 bags - Alternate Masonry Sand 50 YDS - Picked up -Primary 64.00 62.00 66.00 74.00 43.50 77.00 7.95/bg 13.95 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No.1 00-0430-6565-00000 - Street Dept. - Materials & Supplies _.l=.!Q.Q-..lk-=_I~Id.«-~Ì!l9 Fee___.J p = primary vendor a = alternate vendor ROAD MATERIALS -2006 BIDS OPENED - MARCH 2, 2006 MCC Inc Michels Corporation North East Asphalt Inc Vulcan Materials Co Zillges Materials Carew Concrete 4x Concrete DESCRIPTION PO Box 1137 700 Tullar Road W6380 Design Drive 1301 Knapp Street 1800 Fountain Ave 1811 W Edgewood Drive 2974 Green Hill Court Appleton, WI 54912-1137 Neenah, WI 54956 Greenville WI 54942 - Oshkosh, WI 54902 Oshkosh WI 54904 Appleton WI 54913 Oshkosh Wi 54904 - ---_u_----- BREAKER RUN 6" PICKED UP 3.40tk + 5.60 = 9.00 1.70tk + 5.25 = 6.95 " P 1,000 TONS MORE OR LESS DELIVERED $ A 7.70 $ /7.55 $ 9.25 BREAKER RUN 3" PICKED UP 3.4Otk + 5.70 = 9.10 1.7Otk+5.50=7.20 kb 2,000 TONS MORE OR LESS DELIVERED $ A- 7.80 $ 7.80 $ 9.25 1 1/4" BASE COURSE PICKED UP 3.4Otk + 5.70 = 9.10 1.70tk + 5.50 = 7.20 t. ~ 3,000 TONS MORE OR LESS DELIVERED $ Pt 7.80 $ 7.80 $ 9.75 3/4" BASE COURSE PICKED UP 3.4Otk + 5.70 = 9.10 1.7Otk + 5.50 = 7.20 t..I rÞ 3,000 TONS MORE OR LESS DELIVERED $ Rr.. 7.80 $ 7.80 $ 9.75 3/4" CLEAR STONE PICKED UP 3.4Otk + 6.65 = 10.05 1.70tk + 6.65 = 8.35 II::> 1,000 TONS MORE OR LESS DELIVERED $ A 8.75 $ 8.95 $ 9.75 1 1/2" CLEAR STONE PICKED UP 3.40tk + 6.65 = 10.05 1.70tk + 6.65 = 8.35..11 Þ 1,000 TONS MORE OR LESS DELIVERED $ P>t. 8.75 $ 8.95 $ 9:75 3" CLEAR STONE PICKED UP .. 3.4Otk + 7.65 = 11.05 1.7Otk + 7.55 = 9.25 V ip 1,000 TONS MORE OR LESS DELIVERED $ 1>. 9.75 $ 9.85 $ 12.75 SEALCOATCHIPS PICKED UP 3.40tk + 6.70 = 10.10 NO BID 2,500 TONS MORE OR LESS DELIVERED $ P v 8.80 READY-MIX CONCRETE 1000 CY more/less I CLASS C 3/4" STATE MIX $ 71.00 $ 1'=1 69.50 HI/V 64.00 4,000 PSI PER C.Y. $ 65.00 $ A 65.00 $[-' V 62.00 5,000 PSI PER C.Y $ A V 69.00 $ 69.50 $(:J r/ 66.00 7,000 PSI PER C.Y. $ f/ 78.50 $[J v'" 74.00 Slurry 1,000 TNS MORE/LESS $ 45.00 t' V $40.50/T A $43.50/T 9 BAG HI EARLY $ PI 77.00 $ 78.50 $ f V 77.00 Hot Water Winter Service Heat Charge Nov 1 - Mar 31 8.00/yd fuel surchg 1 O.OO/Id MINIMUM DELIVERY CHARGE 80.00 under 4 yds/ Sat 7.00 70.00 under 4 yds HOT MIX ASPHALT PICKED UP 5,000 TONS MORE OR LESS 4.25tk + 28.75 = 33.00 fA. 29.00CS + 4.40tk = 33.40/ P Binder Per ton 28.50L + 2.55tk = 31.05 Surface per ton 4.251k + 30.00 = 34.35 30.00L + 2.55tk = 32.55 V. l 30.75CS+3.4Otk=34.15 "J>. Portland Cement 1 00 BAGS - $9.00/bQ V' 1 $7.45/bQ M $7.95/ba Masonry Sand 50 YDS PICKED UP 3.4Otk + 12.00 = 1<; 4n 1.7Otk + 22.00 = 23.70 1.70tk + 13.65 -15.35 V;fj. 1.70tk+ 12.25= 1þ95 V DELIVERED 14:A'0', - - $ 24.00 $ . 17.15 Fill Sand 200 TONS PICKED UP 3.40tk + 9.00 = 12.40 V 1.7Otk + 3.25 - 4:r 1.70tk + 1)1.65 = 12.35 DELIVERED 11.10 1\. . $ 17" 8.10 ~<- u'"---,-- ,--- -- , I