HomeMy WebLinkAbout0118487-HVAC(furnace & a/c)
~
OSHKOSH
ON THE WATER
Job Address 1430 GROVE ST
CITY OF OSHKOSH
No
118487
HVAC PERMIT - APPLICATION AND RECORD
Owner
THOMASH~AROLSEAMAN
Create Date 03/13/2006
Plan
Contractor D R KOHLMAN INC
Fuel 1"'1 Gas
System [J New
~ Forced Air
I 1 Electric -.-J
Chimney Type r) Chimney A
Category 502 - Residential-Both
~ Electric
1 I Oil
1
U Solar
U Solid
n Otl1er
U Radiant
íTRõtWaterl
() Chimney B
~ Replace
~~
1 1 Suppl. 1
~NC I
U Con. Bumer 1
U Vent
. Direct Vent
0 Not Applicable
Heat Loss
. Existing.
U Variable
( ) Not Applicable
. Other
Value
BTU Rate
() As Approved
.c) As Per Plan
Value 60000
Use/Nature FRI Replace furnace and Air - No EIV provided - A separate electrical penmit is required for the connection of this equipment No
of Work Chimney liner being installed --Where an appliance is permanently disconnected from an existing chimney or vent (CN), the CN shall be
resized as necessary to control flue gas condensation in the interior of the CN and to provide the appliance or appliances served with the
req. draft.
Fees: Valuation
$6,937.00
Plan Approval
$0.00
Permit Fee Paid
$110.00
Issued By:
Date 03/13/2006
D Permit Voided I
Parcelld # 1508930000
In tI1e performance of tI1is work, I agree to perform all work pursuant to rules 90verning the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact tI1e easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
AgenUOwner
Address
117 CHURCH ST P.0.BOX76
ST CLOUD
WI 53079 - 76
Telephone Number
920-999-4631
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.