HomeMy WebLinkAbout2006-Building (remodel basement)
e
OSHKOSH
ON THE WATER
Job Address 3870 PURPLE CREST DR
CITY OF OSHKOSH
No
118465
BUILDING PERMIT. APPLICATION AND RECORD
Owner STEVEN M/MICHEL WEBER
Create Date
03/10/2006
Designer
Contractor
OWNER
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ---2 Sq, Ft. Rooms
Finished/Living ---2 Sq. Ft. Bedrooms
Garage ---2 Sq. Ft. Baths
Height 0 Ft.
D Projection I
Stories
Canopies
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Penmit Not Required
Flood Plain -
# Dwelling Units ~
Height Penmit
Park Dedication
# Structures
~
Use/Nature SFRI Renewal of permit #112486 for remodeling the basement.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: -~ ~ J.!'.-
$1,000.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0,00
Date 03/10/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1261570000
In the performance of this work I agree to perform all work pursuant to ruies goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work
described in this permit appiicatlon within an easement, the City strongly urges the permit appiicant to contact the easement
holder(s) and tfO secure api':ecessary appr~ore starting such activity. ~F-'
Signature . ~ tt ./'.., Date f'¡ i!V
Agent/Owner
Address Oshkosh WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.