HomeMy WebLinkAbout0118468-Building (remodel)
.e
OSHKOSH
ON THE WATER
Job Address 821 E PARKWAY AVE
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
118468
Owner DONALD K DAVIES
Create Date
03/10/2006
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ----2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ----2 Sq, Ft. Bedrooms 0 Stories 2
Garage ----2 Sq. Ft. Baths 0
D Projection I
Canopies 0
Signs
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit Not Required
Flood Plain -
# Dwelling Units ~
Height Permit
-~
Park Dedication
# Structures
~
Use/Nature FRI Remodel Kitchen, first floor bath, first floor bedroom, add second fioor 3/4 bath. Remove 2 load bearing walls, install headers.
ofWork Rearrange Kitchen (new cupboards, cabinets, counter, flooring.) Rearrange and expand 1st floor bath, new fixtures. Ad d relocate closet
in first floor bedroom, convert 2 closets on second floor to 3/4 bath: Note: Headroom of first floor bath discussed with applicant:
ndrew T Graf purchased property on 2/28/06.
HVAC Contractor
Plumbing Contractor
MOREMAN PLUMBING
Electric Contractor
::::d :::uation ~) 0,00000 Plan Approval
$0.00 Permit Fee Paid
$74.00 Park Dedication
$0.00
Date 03/10/2006
Final/D.P. 00/00/0000
D Permit Voided I
Parcelld# 1103120000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit appli ation within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to 5 cu an necessary approvals re starting such activity.
Date :r/ro/O(,
Agent/Owner
- OSHKOSH
WI 54901 - 0000 Telephone Number '1/..0 - 'I/O - V'l10
Signature
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Penmit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not per/onmed within two business days from the time the project is ready.