HomeMy WebLinkAbout0118458-Buidling (front door & correct violations)
0
OSHKOSH
ON THE WATER
Job Address 820 CHERRY ST
CITY OF OSHKOSH
No
118458
BUILDING PERMIT - APPLICATION AND RECORD
OWner JACK L DARLAND
Create Date
Designer
03/10/2006
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
Unfinished/Basement
----2 Sq. Ft.
----2 Sq. Ft.
0 Canopy Q Fence 0 Raze
Class of Const:
Rooms 0 Height ----2 Ft.
Bedrooms ----2 Stories
Baths 0
0 Pier 0 Other
0 Treated Wood
Zoning
Size
Finished/Living
0 Projection I
Garage
----2 Sq. Ft.
Canopies ----2
Signs
----2
Foundation
. Poured Concrete 0 Fioating Slab
0 Concrete Biock 0 Post
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature SFR/ Replacing the front door with a 36" wide door and tuck pointing the foundation correct violations from correction notice.
ofWork
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$500.00 Plan Approval
Issued By:
~
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Date 03/10/2006
Final/D.P. 00/00/0000
0 Permit Voided I
Parcelld # 0502410000
In the performance of this work I agree to perform aU work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit applica~ithif1..ao.e~sement. the City strongiy urges the permit applicant to contact the easement
hoider(s) ~:o sêc'o¡e an~ ~ ssa approvals efore sta iog sue activity. . / . /
Signature ;c.~..¡ Date >e-$/ .I¥ø¿
Address 3448 OAKLAND LN
OSHKOSH
WI 54902 - 7328
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.