HomeMy WebLinkAbout0118457-Building
e
OSHKOSH
ON THE WATER
Job Address 1729 ASHLAND ST
CITY OF OSHKOSH
No
118457
BUILDING PERMIT - APPLICATION AND RECORD
OWner JOSEPH M LENTZ
Create Date
03/10/2006
Contractor
OWNER
Designer
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0
0 Projection I
Canopies ~
Signs
~
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
--
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature SFR/ Remodeling a portion of the living room to create a 1st floor bathroom. An exhaust fan will be installed. Removing 4 windows in the
ofWork 1st floor bedroom (8% light must be maintained) and installing 7 replacement windows on the 2nd story.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valua~i°Ï1J. \ J. $3.000.00 Plan Approval
Issued By: 1'-1,,11'->
$0.00 Permit Fee Paid ~32.00 Park Dedication
$0.00
Date 03/10/2006
Final/D.P. 00/00/0000
0 PenmitVoided I
Parcelld # 1504430000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perfonm the work
described in this permit application within an easement. the City strongly urges the penmit applicant to contact the easement
holder(s) and to ecure aHy n<ttessary ap r als fore starting such activity.
1/ t /1.,
Signature
AgenVOwner
OSHKOSH
Dale ./"J3 --It;'- 0 /
(
WI 54902 - 0000 Telephone Number
Address
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.