Loading...
HomeMy WebLinkAbout0118457-Building e OSHKOSH ON THE WATER Job Address 1729 ASHLAND ST CITY OF OSHKOSH No 118457 BUILDING PERMIT - APPLICATION AND RECORD OWner JOSEPH M LENTZ Create Date 03/10/2006 Contractor OWNER Designer Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 0 Projection I Canopies ~ Signs ~ Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit -- Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Remodeling a portion of the living room to create a 1st floor bathroom. An exhaust fan will be installed. Removing 4 windows in the ofWork 1st floor bedroom (8% light must be maintained) and installing 7 replacement windows on the 2nd story. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valua~i°Ï1J. \ J. $3.000.00 Plan Approval Issued By: 1'-1,,11'-> $0.00 Permit Fee Paid ~32.00 Park Dedication $0.00 Date 03/10/2006 Final/D.P. 00/00/0000 0 PenmitVoided I Parcelld # 1504430000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perfonm the work described in this permit application within an easement. the City strongly urges the penmit applicant to contact the easement holder(s) and to ecure aHy n<ttessary ap r als fore starting such activity. 1/ t /1., Signature AgenVOwner OSHKOSH Dale ./"J3 --It;'- 0 / ( WI 54902 - 0000 Telephone Number Address To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.