HomeMy WebLinkAbout0118443-Plumbing
e
OSHKOSH
ON THE WATER
Job Address 848 FREDERICK ST
CITY OF OSHKOSH
No
118443
PLUMBING PERMIT - APPLICATION AND RECORD
Owner MARY L REICHENBERGER
Plan
Create Date 03/09/2006
Category 410 - Residential-Interior
Contractor ADAMS PLUMBING
Bathtub 1 Shower 0
Whirlpool 0 Floor Drain 0
Lavatory 2 Lndry Tray 0
Toilet 1 Disposal 0
Res. Sink 1 Dishwasher 0
Bar Sink 0 Sump Pump 0
Water Heater 0 Classrm Sink 0
Site Drain 0 Breakrm Sink 0
Roof Drain 0 Ejector/Grind 0
Misc. 0
Fixtures
Water Softner 0 Wait.SI. 0 Shamp Sink 0 Coffee Maker 0
Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0
Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ex! Grease Trap 0
Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Beer Tap 0 Hand Sink 0 Urinal 0 Eye Wash Statn -----.2
Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters -----.2
Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Drink Ftn 0 Serv Sink 0 Soda Disp 0
Use/Nature
of Work
r- ""' ,,_. ~~
Size
Material
Sanitary Sewer
Storm Sewer
Water Service
Type # Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$35.00 0 Permit Voided I
Parcelld #
1005720000
Valuation
Permit Fees
$4.800.00
$0.00
Plan Approval
Issued By
Date 03/09/2006
In the performance of this work. I agree to perform all work pursuant to nules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City slrongly urges the permit applicant to contact the
easement holde ) and to secur ny necessary approvals before starting such activity.
Date ~ "I-Db
Signature
AgenUOwner
OSHKOSH
WI 54904 - 0000
Telephone Number 233-2661
Address 1570 N OAKWOOD
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do We gain entry), your Name and Phone
Number. Unless specified otherwise, We will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.