Loading...
HomeMy WebLinkAbout0118443-Plumbing e OSHKOSH ON THE WATER Job Address 848 FREDERICK ST CITY OF OSHKOSH No 118443 PLUMBING PERMIT - APPLICATION AND RECORD Owner MARY L REICHENBERGER Plan Create Date 03/09/2006 Category 410 - Residential-Interior Contractor ADAMS PLUMBING Bathtub 1 Shower 0 Whirlpool 0 Floor Drain 0 Lavatory 2 Lndry Tray 0 Toilet 1 Disposal 0 Res. Sink 1 Dishwasher 0 Bar Sink 0 Sump Pump 0 Water Heater 0 Classrm Sink 0 Site Drain 0 Breakrm Sink 0 Roof Drain 0 Ejector/Grind 0 Misc. 0 Fixtures Water Softner 0 Wait.SI. 0 Shamp Sink 0 Coffee Maker 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ex! Grease Trap 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 Beer Tap 0 Hand Sink 0 Urinal 0 Eye Wash Statn -----.2 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters -----.2 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Use/Nature of Work r- ""' ,,_. ~~ Size Material Sanitary Sewer Storm Sewer Water Service Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $35.00 0 Permit Voided I Parcelld # 1005720000 Valuation Permit Fees $4.800.00 $0.00 Plan Approval Issued By Date 03/09/2006 In the performance of this work. I agree to perform all work pursuant to nules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City slrongly urges the permit applicant to contact the easement holde ) and to secur ny necessary approvals before starting such activity. Date ~ "I-Db Signature AgenUOwner OSHKOSH WI 54904 - 0000 Telephone Number 233-2661 Address 1570 N OAKWOOD To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do We gain entry), your Name and Phone Number. Unless specified otherwise, We will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.