Loading...
HomeMy WebLinkAboutState Highway-W. New York Ave . .('-. o'r' 81' ATE / MUNI CIP AL AGREEMENT FORA HIGHWAY IMPROVEMENT PROJECT DA TE: July 26, 2005 J.D.: 4994-01-12 Design/4994-0l-13 Construction IJ1Gl!M:~k".,;,~~(;"N~1V¥X9.!!tð:.X~~'A"w,"LENGTH 0.615 mi. LIMITS: Algoma Boulevard to Jackson Street -. . I COUNTY: Winnebago The signatory City of Oshkosh hereinafter called the Municipality, through its undersigned duly authorized officers or officials, hereby requests the State of Wisconsin Department of Transportation, hereinafter called the State, to initiate and effect the highway or street improvement hereinafter described. \ The authority for the Municipality to enter into, this agreement with the State is provided by Section 86.25(1), (2), and (3) of the Statutes. NEEDS AND ESTIMATE SUMMARY: Existing Facility (describe and give reason for request): The existing 2-lane, two-way, asphalt Connector roadway is checked, cracking, and in need of repair. Numerous utility patches are scattered throughout. The curb pan is paved with asphalt and as a result limits surface drainage capacity. The curb & gutter is heaved as is the sidewalk. Both are in need of replacement. The roadway was last surfaced with asphalt in 1981. Proposed Improvement (nature of work): Reconstruct W. New York Avenue under the STP-Urban Program to a 2-lane facility including new concrete sidewalk and storm sewer. Describe non-participating work included in the project contract: Sanitary sewer manhole and water valve adjustments. Describe other work necessary to finish the project completely which will be undertaken independently by the Municipality: Negotiation and acquisition for any real estate for the project, if required. PHASE ESTIMATED COST Total Federal/State Municipal Estimated Cost Funds % Funds % Preliminary Engineering: 4994-01-12 State Review and Proratable $14,000 $0 0 $14,000 100 Real Estate Acquisition: Acquisition ? 100 Constr. (Participating): 4994-01-13 Roadway Items (010) $800,000 **$523,756 80 $276,244 20 SUBTOTAL: $814,000 $523,756 $290,244 Construction (Non-Participating): $2,500 0 0 $2,500 100 TOTAL COST DISTRIBUTION: $816,500 $523,756 $292,744 ** Construction STP - Urban funds for this project are capped. The Federal Government will contribute 80% of the project construction cost for participating items up to a maximum amount of $523,756. The City of Oshkosh is responsible for 20% of the participating costs up to the federal maximum of $523,756 and 100% of the costs exceeding the federal cap. ~ ,\., "', This request is subject to the terms and conditions that follow and is made by the undersigned under proper authority to make such a request for the designated Municipality and upon acceptance by the State shall constitute agreement between the Municipality and the State. ~~..,".'" """" '."-,-,.'",, ". Signed for and in behalf of the C'ty of Oshkosh: City Manager ttorney City Comptroller I hereby certify necessary provisions have been made to pay the liability which will accrue under this contract. 2Q, A.\t £) 6.. V~ City Comptroller 2 r¡-$ð-ZØÞS- Date q~~ q - ?In / JtJl¥Date Date Date ~ .'. . . '. TERMS AND CONDITIONS: 1. The initiation and accomplishment of the improvement will be subject to the applicable Federal and State regulations. 2. The Municipality will pay to the State all costs incurred by the State in connection with the improvement which exceed Federal/State financing commitments or are ineligible for Federal/State financing. 3. Funding of each project phase (preliminary engineering, real estate, construction, and other) is subject to inclusion in an approved program. Federal aid and/or State transportation fund financing will be limited to participation in the costs of the following items as specified in the estimate summary: a) The grading, base, pavement, and curb and gutter. b) Catch basins and inlets for surface water drainage of the improvement with connections to the storm sewer maIn. c) Construction engineering incidental to inspection and supervision of actual construction work. d) Signing and pavement marking including detour routes. e) Storm sewer mains necessary for the surface water drainage. f) New continuous street lighting, if installed at the time of project construction, excluding ornamental lighting. ' g) Construction or replacement of sidewalks and surfacing of private driveway. 4. Work necessary to complete the improvement to be financed entirely by the Municipality or other utility or facility owner includes the following items: a) Damages to abutting property due to change in street or sidewalk widths, grades, or drainage. b) Conditioning, if required, and maintenance of detour routes. c) Repair damages to roads or streets cause by reason of their use in hauling materials incidental to the improvement. d) Bridge width in excess of standards. e) Preliminary engineering and State review services. f) New installations of or alteration of sanitary sewers and connections, water, gas, electric, telephone telegraph, fire or police alarm facilities, parking meters, and similar utilities. 5. As the work progresses, the Municipality will be billed for work completed which is not chargeable to Federal/State funds. Upon completion of the project, a final audit will be made to determine the final division of costs. ' 3