HomeMy WebLinkAboutState Highway-W. New York Ave
. .('-. o'r' 81' ATE / MUNI CIP AL AGREEMENT
FORA
HIGHWAY IMPROVEMENT PROJECT
DA TE: July 26, 2005
J.D.: 4994-01-12 Design/4994-0l-13 Construction
IJ1Gl!M:~k".,;,~~(;"N~1V¥X9.!!tð:.X~~'A"w,"LENGTH 0.615 mi.
LIMITS: Algoma Boulevard to Jackson Street
-. . I
COUNTY: Winnebago
The signatory City of Oshkosh hereinafter called the Municipality, through its undersigned duly authorized
officers or officials, hereby requests the State of Wisconsin Department of Transportation, hereinafter called the
State, to initiate and effect the highway or street improvement hereinafter described.
\
The authority for the Municipality to enter into, this agreement with the State is provided by Section 86.25(1),
(2), and (3) of the Statutes.
NEEDS AND ESTIMATE SUMMARY:
Existing Facility (describe and give reason for request): The existing 2-lane, two-way, asphalt Connector roadway is checked,
cracking, and in need of repair. Numerous utility patches are scattered throughout. The curb pan is paved with asphalt and as a result
limits surface drainage capacity. The curb & gutter is heaved as is the sidewalk. Both are in need of replacement. The roadway was last
surfaced with asphalt in 1981.
Proposed Improvement (nature of work): Reconstruct W. New York Avenue under the STP-Urban Program to a 2-lane facility
including new concrete sidewalk and storm sewer.
Describe non-participating work included in the project contract: Sanitary sewer manhole and water valve adjustments.
Describe other work necessary to finish the project completely which will be undertaken independently by the Municipality:
Negotiation and acquisition for any real estate for the project, if required.
PHASE ESTIMATED COST
Total Federal/State Municipal
Estimated Cost Funds % Funds %
Preliminary Engineering: 4994-01-12
State Review and Proratable $14,000 $0 0 $14,000 100
Real Estate Acquisition:
Acquisition ? 100
Constr. (Participating): 4994-01-13
Roadway Items (010) $800,000 **$523,756 80 $276,244 20
SUBTOTAL: $814,000 $523,756 $290,244
Construction (Non-Participating): $2,500 0 0 $2,500 100
TOTAL COST DISTRIBUTION: $816,500 $523,756 $292,744
** Construction STP - Urban funds for this project are capped. The Federal Government will contribute 80% of
the project construction cost for participating items up to a maximum amount of $523,756. The City of Oshkosh
is responsible for 20% of the participating costs up to the federal maximum of $523,756 and 100% of the costs
exceeding the federal cap.
~ ,\., "',
This request is subject to the terms and conditions that follow and is made by the undersigned under proper
authority to make such a request for the designated Municipality and upon acceptance by the State shall
constitute agreement between the Municipality and the State.
~~..,".'" """" '."-,-,.'",, ".
Signed for and in behalf of the C'ty of Oshkosh:
City Manager
ttorney
City Comptroller
I hereby certify necessary provisions
have been made to pay the liability which will
accrue under this contract.
2Q, A.\t £) 6.. V~
City Comptroller
2
r¡-$ð-ZØÞS- Date
q~~
q - ?In / JtJl¥Date
Date
Date
~ .'.
. . '.
TERMS AND CONDITIONS:
1. The initiation and accomplishment of the improvement will be subject to the applicable Federal and State
regulations.
2. The Municipality will pay to the State all costs incurred by the State in connection with the improvement
which exceed Federal/State financing commitments or are ineligible for Federal/State financing.
3. Funding of each project phase (preliminary engineering, real estate, construction, and other) is subject to
inclusion in an approved program. Federal aid and/or State transportation fund financing will be limited to
participation in the costs of the following items as specified in the estimate summary:
a) The grading, base, pavement, and curb and gutter.
b) Catch basins and inlets for surface water drainage of the improvement with connections to the storm
sewer maIn.
c) Construction engineering incidental to inspection and supervision of actual construction work.
d) Signing and pavement marking including detour routes.
e) Storm sewer mains necessary for the surface water drainage.
f) New continuous street lighting, if installed at the time of project construction, excluding ornamental
lighting. '
g) Construction or replacement of sidewalks and surfacing of private driveway.
4. Work necessary to complete the improvement to be financed entirely by the Municipality or other utility or
facility owner includes the following items:
a) Damages to abutting property due to change in street or sidewalk widths, grades, or drainage.
b) Conditioning, if required, and maintenance of detour routes.
c) Repair damages to roads or streets cause by reason of their use in hauling materials incidental to the
improvement.
d) Bridge width in excess of standards.
e) Preliminary engineering and State review services.
f) New installations of or alteration of sanitary sewers and connections, water, gas, electric, telephone
telegraph, fire or police alarm facilities, parking meters, and similar utilities.
5. As the work progresses, the Municipality will be billed for work completed which is not chargeable to
Federal/State funds. Upon completion of the project, a final audit will be made to determine the final
division of costs. '
3