HomeMy WebLinkAbout2006-Building (signs-revised)
~
OSHKOSH
ON THE WATER
Job Address 2550 S WASHBURN ST
Designer Michael Olkwitz
Category 254 - Signs
Type 0 Building
Zoning
Cont
or
BADGER LIGHTING & SIGNS
Plan
. Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
--~
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height
0 Ft.
0 Projection I
Finished/Living
Bedrooms 0
Stories
Canopies 0
Garage
~Sq.Ft.
Baths
Signs
~
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Otl1er
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature North Tenant / Installation of 7 wall signs and replacement of two ground sign panels. 2 wall signs on east elevation totaling 169.5 sq ft, 2
of Work all signs on west elevation totaling 121.8sqftand 3 wall signs on north elevation totaling 167.7sq ft. Signs are for 2nd Wind Exercise
Equipment". They are internally illuminated raceway mounted channel letters.
HVAC Contractor
Plumbing Contractor
Electric Contractor
:::S~d :::ua~) $27,000.00 Plan Approval
$0.00 Permit Fee Paid
$145.00 Park Dedication
$0.00
Date 03/08/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1329430101
In the performance of tI1is work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvais before starting such activity.
Signature
Date
Address 5440 LAURA LN
AgenVOwner
GREENDALE
WI 53129 - 0000
Telephone Number
414-421-2233
To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.