Loading...
HomeMy WebLinkAbout2006-Building (signs-revised) ~ OSHKOSH ON THE WATER Job Address 2550 S WASHBURN ST Designer Michael Olkwitz Category 254 - Signs Type 0 Building Zoning Cont or BADGER LIGHTING & SIGNS Plan . Sign 0 Canopy Class of Const: 0 Fence 0 Raze --~ Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. 0 Projection I Finished/Living Bedrooms 0 Stories Canopies 0 Garage ~Sq.Ft. Baths Signs ~ Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Otl1er Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature North Tenant / Installation of 7 wall signs and replacement of two ground sign panels. 2 wall signs on east elevation totaling 169.5 sq ft, 2 of Work all signs on west elevation totaling 121.8sqftand 3 wall signs on north elevation totaling 167.7sq ft. Signs are for 2nd Wind Exercise Equipment". They are internally illuminated raceway mounted channel letters. HVAC Contractor Plumbing Contractor Electric Contractor :::S~d :::ua~) $27,000.00 Plan Approval $0.00 Permit Fee Paid $145.00 Park Dedication $0.00 Date 03/08/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1329430101 In the performance of tI1is work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvais before starting such activity. Signature Date Address 5440 LAURA LN AgenVOwner GREENDALE WI 53129 - 0000 Telephone Number 414-421-2233 To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.