HomeMy WebLinkAbout0118434-Plumbing (bath remodel)
e
OSHKOSH
ON THE WATER
Job Address 1210LOCUSTST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
118434
Create Date 03/08/2006
Plan
Owner DUANE H BUEHRING ETAL
Contractor WATTERS PLUMBING
Category 410 - Residential-Interior
Bathtub 1
Whirlpool ~
Lavatory 1
Toilet 0
Res. Sink 0
Bar Sink ~
Water Heater ~
Site Drain 0
Roof Drain 0
Misc. 0
Fixtures
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
0
0
0
0
0
0
0
0
0
WaterSoftner ~
Local Waste 0
Clothes Wshr ~
Bidet 0
Beer Tap ~
Lab Sink ~
Sterilizer ~
Dip Well 0
Drink Ftn ~
Wait.SI.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
0
0
0
0
0
0
0
0
0
Shamp Sink ~
FlrlWst Sink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
Standp Rec 0
Ice Maker 0
Gar Drain 0
Soda Disp 0
Coffee Maker 0
Int Grease Trap 0
Ext Grease Trap ~
RPZ Valve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Use/Nature
ofWork
r~~O" "'~, .~.; =
Size
Valuation
Date 03/08/2006
Issued By
Sanitary Sewer
Storm Sewer
Water Service
$3,000.00
Plan Approval
$0.00
Material
Permit Fees
Type
#
0
0
0
0
0
Conn. Type '
0
0
0
0
0
$20.00 D Permit Voided I
Parcelld #
1611920000
In the performance of this work, i agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Date
Signature
Telephone Number
920-733-8125
Agent/Owner
MENASHA
WI 54952 - 0118
Address PO BOX 118
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.