Loading...
HomeMy WebLinkAbout0118434-Plumbing (bath remodel) e OSHKOSH ON THE WATER Job Address 1210LOCUSTST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 118434 Create Date 03/08/2006 Plan Owner DUANE H BUEHRING ETAL Contractor WATTERS PLUMBING Category 410 - Residential-Interior Bathtub 1 Whirlpool ~ Lavatory 1 Toilet 0 Res. Sink 0 Bar Sink ~ Water Heater ~ Site Drain 0 Roof Drain 0 Misc. 0 Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind 0 0 0 0 0 0 0 0 0 WaterSoftner ~ Local Waste 0 Clothes Wshr ~ Bidet 0 Beer Tap ~ Lab Sink ~ Sterilizer ~ Dip Well 0 Drink Ftn ~ Wait.SI. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 0 0 0 0 0 0 0 0 Shamp Sink ~ FlrlWst Sink 0 Catch Basin 0 Wash Ftn 0 Urinal 0 Standp Rec 0 Ice Maker 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap ~ RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Use/Nature ofWork r~~O" "'~, .~.; = Size Valuation Date 03/08/2006 Issued By Sanitary Sewer Storm Sewer Water Service $3,000.00 Plan Approval $0.00 Material Permit Fees Type # 0 0 0 0 0 Conn. Type ' 0 0 0 0 0 $20.00 D Permit Voided I Parcelld # 1611920000 In the performance of this work, i agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Telephone Number 920-733-8125 Agent/Owner MENASHA WI 54952 - 0118 Address PO BOX 118 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.